EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Newport, Pennsylvania. Completed plans call for site work for a water / sewer project.

The work generally includes the removal of existing revenue water meters in the Owner's system followed by the installation of a replacement meter to be provided by the Owner. Further, work will include scheduling of the work at individual meter locations, and performing standard plumbing work associated with installing/replacing any water appliance. Lastly, the work will include completing a data sheet, recording pertinent data about the work, such as: incoming service line size and material, condition of location of meter installation and it appropriateness, existence or absence of a manifold in the case of a duplex or multiple service location, condition of curb stop (functioning/not functioning). The Project has an expected duration of one hundred eighty (180) days. Funding for the Project is provided via a USDA Rural Development loan secured by Owner. Bidders are notified that David-Bacon wages rates apply to work performed. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bid Hold Period Bidders are required to hold their price for a minimum of ninety (90) days to allow Owner to award a contract. Once a contract is awarded, bonds will be returned to those bidders not awarded a contract. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. CLARIFICATION DEADLINE 4/26/2022 4:00 PM

Bid Results

Water / Sewer

$220,150.00

Public - City

Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
59
Bidding Soon
861
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 2, 2022

img_map_placeholder

Multiple Locations, Newport, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cold Water Meter Exchange

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.