Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Telluride, Colorado. Completed plans call for the renovation of a water / sewer project.
The Town of Telluride owns and operates several water treatment facilities to provide drinking water for the service area. The Pandora Water Treatment Plant (WTP) and the Mill Creek WTP are the primary water treatment facilities in operation. Each plant provides roughly 50% of the demand during peak season. The Mill Creek WTP was originally constructed in 1987 as a conventional filtration plant. The 1.0 MGD facility contains two parallel treatment trains which at one time consisted of flocculation tanks and up flow tube settlers in sedimentation tanks. The multimedia filters were taken out of service to accommodate ultra-filtration membranes installed downstream of the flocculation/sedimentation process. Both granular media filters were removed. The ultra-filtration membranes are currently on the last of their life cycle and must be replaced (to include the headers and stands). A hot water wash clean-in-place is also needed. Mill Creek WTP needs a new filter/membrane and clean-in-place system commissioned and implemented to include system and process integration within the existing footprint. Existing raw water data can be requested. Project includes raw water quality analysis for chemical additions needed for new filters before installation of equipment. Water production will be maintained at 1MGD. Teams may be contractor, engineer, or vendor lead. Project team is expected to help with any CDPHE requirements and documentation. February 9, 2022 Optional Pre-Proposal Site Visit February 10, 2022 Optional Pre-Proposal Zoom Meeting (pending) March 4, 2022 Proposals Due March 18, 2022 Contract Award April 18, 2022 Project Start December 1, 2022 Project Completion December 2, 2022 Final Project Inspection Completed by Town Staff December 9, 2022 Project Closeout/End of Contract Project Location Mill Creek Water Treatment Plant Telluride, Colorado 81435
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2022
April 18, 2022
1995 CO-145, Telluride, CO
Related To This Project
Telluride, CO
Bid Date: Mar 11 2022
Telluride, CO
Bid Date: Sep 30 2024
Telluride, CO
Bid Date: Mar 04 2022
Telluride, CO
Bid Date: Oct 15 2023
Telluride, CO
Bid Date: Sep 30 2022
Telluride, CO
--
Telluride, CO
--
Telluride, CO
Bid Date: Apr 26 2024
Telluride, CO
--
Telluride, CO
Bid Date: Jun 23 2023
Telluride, CO
Bid Date: Jun 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.