Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 14, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of a water / sewer project in Telluride, Colorado. Completed plans call for the renovation of a water / sewer project.
The Town of Telluride owns and operates several water treatment facilities to provide drinking water for the service area. The Pandora Water Treatment Plant (WTP) and the Mill Creek WTP are the primary water treatment facilities in operation. Each plant provides roughly 50% of the demand during peak season. The Mill Creek WTP was originally constructed in 1987 as a conventional filtration plant. The 1.0 MGD facility contains two parallel treatment trains which at one time consisted of flocculation tanks and up flow tube settlers in sedimentation tanks. The multimedia filters were taken out of service to accommodate ultra-filtration membranes installed downstream of the flocculation/sedimentation process. Both granular media filters were removed. The ultra-filtration membranes are currently on the last of their life cycle and must be replaced (to include the headers and stands). A hot water wash clean-in-place is also needed. Mill Creek WTP needs a new filter/membrane and clean-in-place system commissioned and implemented to include system and process integration within the existing footprint. Existing raw water data can be requested. Project includes raw water quality analysis for chemical additions needed for new filters before installation of equipment. Water production will be maintained at 1MGD. Teams may be contractor, engineer, or vendor lead. Project team is expected to help with any CDPHE requirements and documentation. February 9, 2022 Optional Pre-Proposal Site Visit February 10, 2022 Optional Pre-Proposal Zoom Meeting (pending) March 4, 2022 Proposals Due March 18, 2022 Contract Award April 18, 2022 Project Start December 1, 2022 Project Completion December 2, 2022 Final Project Inspection Completed by Town Staff December 9, 2022 Project Closeout/End of Contract Project Location Mill Creek Water Treatment Plant Telluride, Colorado 81435
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2022
April 18, 2022
1995 CO-145, Telluride, CO
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed