Published May 17, 2022 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for paving for a sidewalk / parking lot; for site work for a playground / park / athletic field; sidewalk / parking lot; and water / sewer project.
Site Directions: Park areas between and along SW Des Moines Street south of SW Magazine Road in Prairie Trail, Ankeny, Iowa. A copy of said plans, specifications, and form of contract, and estimated total cost is now on file at the Ankeny Public Services Building and may be examined at 1210 NW Prairie Ridge Drive, Ankeny, Iowa, 50023. An electronic copy of the Contract Documents is available his fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a reusable condition, and (2) they are returned within fourteen (14) calendar days after the award of the project. You must call 515-963-3576 in advance to reserve a paper copy.Download delivery fee is $0.00 Project Category Code: Landscaping (Planting Projects), Parks, Recreation, Trail Work, Sitework/Excavating and Grading, Parking Lots/Ramps, Signage, Erosion Control - Temporary Description: The 2022 SW Des Moines Street Parks - Phase 1 project includes grading, PCC paving for parking and sidewalks, storm sewer, sanitary and water services, and landscaping for the first phase of a new park in Prairie Trail. Other associated improvements include traffic control, traffic signs, surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the project no later than July 22, 2022. Substantially complete shall be defined as all utility, grading, and pavement construction completed, with the new parking area, driveway, and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). Fully complete shall be defined as all work completed including landscaping and seeding, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Two Hundred Fifty Dollars ($250.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).
Bid Results
Sidewalks / Parking Lot
$332,036.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2022
April 28, 2022
SW Des Moines St, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Jul 27 2021
Ankeny, IA
Bid Date: Dec 09 2021
Ankeny, IA
Bid Date: Jun 11 2021
Ankeny, IA
Bid Date: Feb 16 2021
Ankeny, IA
Bid Date: Feb 09 2021
Ankeny, IA
Bid Date: Jul 28 2020
Ankeny, IA
Bid Date: Jul 28 2020
Ankeny, IA
Bid Date: Jul 26 2022
Ankeny, IA
Bid Date: May 31 2022
Ankeny, IA
Bid Date: May 10 2022
Ankeny, IA
Bid Date: May 17 2022
Ankeny, IA
--
Ankeny, IA
Bid Date: Mar 05 2019
Ankeny, IA
Bid Date: May 26 2020
Ankeny, IA
Bid Date: May 11 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.