Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 16, 2022 at 8:00 PM

Updated September 24, 2026

Site work for a water / sewer project in Daly City, California. Completed plans call for site work for a water / sewer project.

Installation of approximately 2,290 ft of 6-inch and 925 ft of 8-inch ductile iron pipe water line, on Grandview Boulevard, Golden Gate Avenue, Bancroft Avenue, Dwight Avenue, Pacifica Avenue, and on the west side of Highway 1, as shown on the Contract Drawings. Installation of approximately 95 ft of 8-inch ductile iron water carrier line in 16-inch steel carrier pipe across Highway 1 via auger boring, as shown on the Contract Drawings.

Bid Results

Water / Sewer

$1,496,630.00

Public - County

Site Work

16

12

6

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
210
Bidding Soon
3,420
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

June 27, 2022

Project location map

Grandview Ave, Daly City, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed