Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 15, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Thornbury, Ontario. Contact the soliciting agency for additional information.
This Request for Proposals (the "RFP") is an invitation by The Corporation of the Town of The Blue Mountains (the "Town") to prospective proponents to submit proposals for Development of a Wastewater Master Planas further described in Section A of the RFP Particulars (Appendix B) (the "Deliverables"). The Town wishes to engage the services of a consulting engineering firm to provide engineering services to undertake a Municipal Class Wastewater Master Plan that meets the requirements of the Municipal Class EA process to satisfy Phase One and Two requirements for all proposed projects. The Town is located on the south shore of Georgian Bay. It is known as a four-season recreation community and is currently experiencing a period of rapid growth. The permanent resident population of the Town, according to the estimated 2021 Census, is 9321; however, since a large contingent of property owners are seasonal residents, the combined serviced population is expected to be in the range of 23,000. When the various ski resorts are operating at peak capacity, the equivalent population is estimated to be 60,000. The Town's collection system is unique in that it is a very long and narrow system stretching more than 18 km along the Georgian Bay shoreline. This together with varying topography within the Town, has resulted in the creation of a system that is relatively complex for its serviced population. Wastewater is collected by two independent systems and treated at the Thornbury or the Craigleith Wastewater Treatment Plants (WWTPs) before being discharged to the Beaver River and Georgian Bay respectively. The Town is looking to retain professional consulting engineering services to undertake a Wastewater Master Plan to provide a long-term sustainable plan to support growth consistent the Town's Official Plan. Question Deadline: April 21, 2022 – 2:00pm local time The method of contractor selection has not been determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2022
Multiple Locations, Thornbury, ON
Related To This Project
Thornbury, ON
Bid Date: Mar 24 2022
Thornbury, ON
Bid Date: Jun 09 2020
Thornbury, ON
Bid Date: Jan 12 2023
Thornbury, ON
Bid Date: Jun 30 2022
Thornbury, ON
Bid Date: Apr 21 2022
Thornbury, ON
Bid Date: May 23 2019
Thornbury, ON
Bid Date: Aug 04 2022
Thornbury, ON
Bid Date: Apr 14 2022
Thornbury, ON
Bid Date: Aug 17 2023
Thornbury, ON
--
Thornbury, ON
Bid Date: Nov 03 2022
Thornbury, ON
Bid Date: Oct 13 2022
Thornbury, ON
Bid Date: Oct 13 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
