BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Thornbury, Ontario. Contact the soliciting agency for additional information.

This Request for Proposals (the "RFP") is an invitation by The Corporation of the Town of The Blue Mountains (the "Town") to prospective proponents to submit proposals for Development of a Wastewater Master Planas further described in Section A of the RFP Particulars (Appendix B) (the "Deliverables"). The Town wishes to engage the services of a consulting engineering firm to provide engineering services to undertake a Municipal Class Wastewater Master Plan that meets the requirements of the Municipal Class EA process to satisfy Phase One and Two requirements for all proposed projects. The Town is located on the south shore of Georgian Bay. It is known as a four-season recreation community and is currently experiencing a period of rapid growth. The permanent resident population of the Town, according to the estimated 2021 Census, is 9321; however, since a large contingent of property owners are seasonal residents, the combined serviced population is expected to be in the range of 23,000. When the various ski resorts are operating at peak capacity, the equivalent population is estimated to be 60,000. The Town's collection system is unique in that it is a very long and narrow system stretching more than 18 km along the Georgian Bay shoreline. This together with varying topography within the Town, has resulted in the creation of a system that is relatively complex for its serviced population. Wastewater is collected by two independent systems and treated at the Thornbury or the Craigleith Wastewater Treatment Plants (WWTPs) before being discharged to the Beaver River and Georgian Bay respectively. The Town is looking to retain professional consulting engineering services to undertake a Wastewater Master Plan to provide a long-term sustainable plan to support growth consistent the Town's Official Plan. Question Deadline: April 21, 2022 – 2:00pm local time The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
124
Bidding Soon
3,108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2022

Project location map

Multiple Locations, Thornbury, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.