BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Firestone, Colorado. Completed plans call for site work for a water / sewer project.

Question Acceptance Deadline 07/08/2022 07:00 PM EDT Questions are submitted online No The Work for which the Bid is requested consists of: The base bid utility work is comprised of traditional "open cut" methodology to install roughly 1,700 LF of 8-inch C900 PVC DR18 waterline. Work includes connections to existing services, hydrant installation/replacement; installation of fittings, valves, and other pipeline appurtenances as more specifically defined herein. The base bid surface improvements are comprised of full depth asphalt removal and replacement, ribbon curb, concrete pan, grading modifications, and modifications to existing landscaping and plantings, as impacted by utility installations. Contractor shall furnish all materials, equipment, supplies, and appurtenances; provide all construction equipment and tools; and perform all necessary labor and supervision to complete the Work. Add alternates include additional 445LF of 8-inch C900 PVC DR18 waterline installation, surface restoration, and removal and disposal of existing asbestos cement pipe per CDPHE and OSHA regulations, for the segments shown on the contract drawings.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
63
Bidding Soon
932
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2022

September 13, 2022

img_map_placeholder

To Be Determined, Firestone, CO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.