BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Riverside, California. Conceptual plans call for the construction of a educational facility.

The University of California, Riverside (UCR, UC Riverside, or University), through its Planning, Design & Construction (PD&C) department, will select a Design Professional to perform pre-design services, Phase 1, for the Bannockburn Village Housing Study. The University will initiate a multi-phase contract to complete the Bannockburn Housing Study as Phase 1, with the option to enter into Phase 2 for preparation of the Detail Project Program and/or Construction Documents. Timing and funding of a future project is unknown. Bannockburn Village Housing Study Project TBD o Phase 1 services will be assigned using a Professional Service Agreement (PSA). Award of the contract for Phase 1 services does not guarantee that the chosen firm will continue through Phase 2. o Exercise of Phase 2 Services will be at the sole discretion of the University and will be assigned using an Executive Design Professional Agreement (EDPA) if it is determined that the project delivery will be Lump-Sum or CM at Risk. If Phase 2 services are to be delivered via a Design Build process, the PSA will be used to cover the balance of services to complete a Basis of Design. on Phase 1 services will not be eligible to participate in any subsequent services or work covered in Phase 2. Questions may be addressed by email to Mary Ramirez at mary.ramirez@ucr.edu. The lastday questions will be received will be July 13, 2022, 3:00 PM. The University reserves the right to reject any or all responses to this RFQ and to waive non-material irregularities in any response received. The execution of an Agreement with any firm selected pursuant to this advertisement may be contingent upon pending University approvals, including but not necessarily limited to the approval of the University's Board of Regents to commence the Preliminary Plans Phase ("Pphase") of project implementation. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$5,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
100
Bidding Soon
2,220
All Active Projects
1,005
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

img_map_placeholder

3637 Canyon Crest Dr, Riverside, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.