BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a civil project in Creston, British Columbia. Completed plans call for site work for a bridge / tunnel; and road / highway.

Overview of the Work/Service Required Permanent deactivation of Branches 7 and 8 of the Boundary Forest Service Road. Deactivation will include: Full removal of bridges N7-150 and N7-151 superstructures, abutments and pylons. Most wooden bridge components are creosoted and will be required, as part of the contract, to be hauled off site to an approved facility (Creston RDCK will accept treated wood). Minor deactivation road works past N7-151 bridge on Branch 7. FSR was previously deactivated, but requires some minor works to stabilize the road prism. No road deactivation works required past bridge N7-150 on Branch 8-just bridge removal. All bridge removal works for N7-150 and 151 must be conducted under the contractors own Environmental Monitor's prescribed measures, plan and administration. All in-stream works to be conducted with-in the Aug 20-October 15 fish window. Located at: 24.5 Km and 29.25 Km on the Boundary Forest Service Road (Boundary FSR branches east off the Maryland FSR at 12.0 Km, Maryland FSR takes off Highway #3, 27.3 Km west of Creston). Documents can be obtained from www.bcbid.gov.bc.ca.

Award

Bridges / Tunnels

$73,700.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
6
Bidding Soon
163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 19, 2022

Project location map

Multiple Locations, Creston, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.