Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a civil project in Creston, British Columbia. Completed plans call for site work for a bridge / tunnel; and road / highway.
Overview of the Work/Service Required Permanent deactivation of Branches 7 and 8 of the Boundary Forest Service Road. Deactivation will include: Full removal of bridges N7-150 and N7-151 superstructures, abutments and pylons. Most wooden bridge components are creosoted and will be required, as part of the contract, to be hauled off site to an approved facility (Creston RDCK will accept treated wood). Minor deactivation road works past N7-151 bridge on Branch 7. FSR was previously deactivated, but requires some minor works to stabilize the road prism. No road deactivation works required past bridge N7-150 on Branch 8-just bridge removal. All bridge removal works for N7-150 and 151 must be conducted under the contractors own Environmental Monitor's prescribed measures, plan and administration. All in-stream works to be conducted with-in the Aug 20-October 15 fish window. Located at: 24.5 Km and 29.25 Km on the Boundary Forest Service Road (Boundary FSR branches east off the Maryland FSR at 12.0 Km, Maryland FSR takes off Highway #3, 27.3 Km west of Creston). Documents can be obtained from www.bcbid.gov.bc.ca.
Award
Bridges / Tunnels
$73,700.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
September 19, 2022
Multiple Locations, Creston, BC
Related To This Project
Creston, BC
Bid Date: Mar 28 2024
Creston, BC
Bid Date: Mar 16 2022
Creston, BC
Bid Date: Jun 12 2023
Creston, BC
Bid Date: Aug 09 2023
Creston, BC
Bid Date: Aug 31 2023
Creston, BC
Bid Date: Mar 03 2022
Creston, BC
Bid Date: Feb 25 2022
Creston, BC
--
Creston, BC
Bid Date: Mar 25 2021
Creston, BC
Bid Date: Apr 25 2022
Creston, BC
Bid Date: Nov 09 2022
Creston, BC
Bid Date: Jun 03 2022
Creston, BC
Bid Date: Oct 11 2022
Creston, BC
Bid Date: Nov 15 2022
Creston, BC
Bid Date: Oct 03 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
