Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2022 at 7:00 PM
Updated September 15, 2023
Site work and paving for a bridge / tunnel in Sikanni Chief, British Columbia. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This is the first phase (Phase One) of a two-phase competition. The first phase will evaluate the qualifications of all bidders. The second phase, (Phase Two), will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of a contract in Phase Two, the pre-qualification list resulting from the first phase will expire and will not be used in any other solicitation. The Sikanni Chief River Bridge has been damaged due to high heat impacts resulting from a truck fire at the south approach to the structure. This contract includes installation of temporary works that will strengthen the bridge to allow for reinstatement of single lane alternating truck traffic. The scope of work included in this strengthening contract includes installation of steel bridge girders on the bridge deck within span 1 and span 2 combined with high strength steel bars that extend below the superstructure which support transverse steel wide flange beams. The scope of work will include supply, fabrication, and erection for all of the strengthening members with the exception of the steel girders which will be supplied by PSPC. The Contractor shall perform and complete the work within three (3) weeks of Contract Award. Location: Km 256.1 Alaska Highway, BC Enquiries: Janie Leung, Supply Specialist Tel: (778) 919-3273 Email: Janie.Leung@pwgsc.gc.ca This procurement office provides procurement services to the public in English. The Crown retains the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Cancelled - Plans to retender has not been determined.
Project Abandoned
Bridges / Tunnels
$5,000,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 11, 2022
December 23, 2022
Alaska Hwy, Sikanni Chief, BC
Related To This Project
Sikanni Chief, BC
Bid Date: Apr 19 2022
Sikanni Chief, BC
Bid Date: Feb 06 2024
Sikanni Chief, BC
Bid Date: Sep 19 2024
Sikanni Chief, BC
Bid Date: Jul 07 2025
Sikanni Chief, BC
Bid Date: Aug 12 2025
Sikanni Chief, BC
Bid Date: Dec 11 2025
Coquitlam, BC
--
Vancouver, BC
Bid Date: Oct 12 2022
Kelowna, BC
Bid Date: Oct 28 2022
Summerland, BC
Bid Date: Nov 02 2022
Vancouver, BC
Bid Date: Nov 22 2022
Vanderhoof, BC
Bid Date: Nov 17 2022
Esquimalt, BC
Bid Date: Oct 12 2022
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
