BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2024 at 7:00 PM

Updated November 19, 2024

Site work, paving, outdoor lighting and new construction of a mixed-use development in Big Rapids, Michigan. Completed plans call for the construction of a recreation facility; playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a playground / park / athletic field.

The Depot Trail Head generally includes construction of a park with the following amenities: Pavilion building with restrooms Utility connections for pavilion Paved parking area Sidewalks Parking area for historic depot building Site lighting Furnishings such as picnic tables, benches, bike loops, bike repair station, and drinking fountain BID SECURITY A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. 1. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1,000 for each day that expires after such time until the Work is completed and ready for final payment. 3. Milestone 1: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for achievement of Milestone 1, until Milestone 1 is achieved, or until the time specified for Substantial Completion is reached, at which time the rate indicated in Paragraph 4.05.A.1 will apply, rather than the Milestone rate. 4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently. The Work will be substantially complete on or before June 20, 2025, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 20, 2025. The City of Big Rapids reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the City of Big Rapids. Question Deadline 09/26/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.

Award

Playgrounds / Parks / Athletic Fields

$817,696.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

27

22

5

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

December 2, 2024

Project location map

To Be Determined, Big Rapids, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.