EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in East Palo Alto, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

City of East Palo Alto Notice Inviting Bids US 101 / University Avenue Interchange Improvements Project City Project No. ST-1 Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as US 101/ University Avenue Interchange Improvements Project (the "Project") includes a pedestrian overcrossing, highway off-ramp improvements (total: 2), roadway reconstruction, traffic signal modifications, intersection improvements, and landscaping, according to plans and specifications prepared by the City of East Palo Alto. Funding for the Project is from Federal, State, and Local sources. The DBE goal for the Project is 22%. The number of working days for all work except the plant establishment period is two hundred and eighty (280) working days. The number of working days including the plant establishment period is five hundred and fifty (550) working days. As of June 1, 2023, the general contractor is in pre-construction. Construction is anticipated to begin July 2023.

Pre-Construction/Negotiated

Roads / Highways

$11,966,203.00

Public - City

Paving, Site Work

137

6

6

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
77
Bidding Soon
1,692
All Active Projects
704
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

July 17, 2023

img_map_placeholder

US-101, East Palo Alto, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.