Site work for a civil project in Oak Creek, Wisconsin. Completed plans call for site work for a bridge / tunnel; and pipeline.
Online Bidding: Available Description: The project consists of the removal of 210 lineal feet of 1-inch natural gas piping, the removal and replacement of 400 lineal feet of 2-inch natural gas piping, the removal and replacement of 60 lineal feet of 3-inch natural gas piping and the removal and replacement of 627 lineal feet of 6-inch natural gas piping. Valve replacements, as required to match the existing and proposed locations, will also be included as noted in the Special Attachments. The Contractor shall provide temporary hot water heating for Buildings 309, 378, 380 and 381 during the completion of the natural gas piping replacements, as noted in Section 01500 - TEMPORARY CONSTRUCTION FACILITIES AND UTILITIES. The time for completion of the Contract shall be 500 days CONTRACT: S06038CXX Work covered by these Contract Documents in general covers the construction of the following facilities: Structure 367 - Utility Tunnel No. 2 Structure 369 - Utility Tunnel No. 4 Structure 370 - Utility Tunnel No. 5
Bid Results
Pipeline
$248,841.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
April 10, 2023
Multiple Locations, Oak Creek, WI
Related To This Project
Oak Creek, WI
Bid Date: Dec 05 2024
Oak Creek, WI
Bid Date: Mar 16 2023
Oak Creek, WI
Bid Date: Mar 17 2023
Oak Creek, WI
--
Oak Creek, WI
Bid Date: Mar 31 2023
Oak Creek, WI
Bid Date: Apr 11 2023
Oak Creek, WI
Bid Date: Mar 31 2023
Oak Creek, WI
Bid Date: Apr 05 2023
Oak Creek, WI
Bid Date: Feb 02 2023
Oak Creek, WI
--
Oak Creek, WI
Bid Date: Feb 26 2020
Oak Creek, WI
Bid Date: Aug 31 2021
Oak Creek, WI
Bid Date: Sep 22 2021
Oak Creek, WI
Bid Date: Dec 10 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.