Site work and paving for a road / highway in Mill Creek, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The July 2021 Pavement Management Analysis Report by Infrastructure Management Services identified segments of streets that had Pavement Condition Indicies (PCIs) in the 50 to 60 range (corresponding to a "Fair" to "Good" condition). These conditions are nearly at the minimum level of service called for in the 2015 Mill Creek Comprehensive Plan. Pavement preservation methods are still feasible for streets with this level of condition, but generally involve much more extensive full-depth pavement replacement panels, areas of street subgrade reconditioning and recompaction, and similar project elements more expensive and longer in construction duration than a typical thin- to medium-overlay project. This project to overlay and rehabilitate the condition of Trillium Blvd is one example. This work will generally include grinding and full-width milling of at least the upper 3-6 inches of street surface for much of the area, removal and replacement of panels of asphalt requiring full depth replacement, regrading and recompaction of the street in full-depth replacement areas, placement of new asphalt, adjustments of utility lid rims, and restriping. Where removed by overlay activities, traffic signal detection loops will also be replaced. Unlike most pavement preservation overlay project, this project includes all associated ADA-required street and sidewalk improvements to be compatible with changes/adjustments in finished pavement surfaces. This project is included in the City of Mill Creek's FY 2023-2028 Capital Improvement Plan (CIP) As of March 15, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
49
Bidding Soon
906
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

Trillium Blvd, Mill Creek, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.