Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work and renovation of a mixed-use development in Glastonbury, Connecticut. Conceptual plans call for the renovation of a golf course; clubhouse / community center; water / sewer project; and for site work for a water / sewer project.
Update: The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funds were utilized for trajectory studies for the #1 and #2 holes and possible netting installed. Further analysis is currently being done for potential options; cost estimates to be refined. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement and parking lot lights. Revenues derived from course operations help offset the capital costs incurred. As of May 16, 2025, this project is included in the city's 2026-2030 Improvement Program (CIP). ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://www.glastonburyct.gov/home/showpublisheddocument/40931/638095418132130000 Restoration of the primary irrigation pond on the 9th hole has been completed, as well as the first phase of replacement of protective netting. The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funds will be utilized for trajectory studies for the #1 and #2 holes and possible netting installed. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement. Revenues derived from course operations help offset the capital costs incurred. Project is in Town of Glastonbury capital budget 2024-2028 CIP 59 _______________________________________________________________________________________________________________________________ Restoration of the primary irrigation pond on the 9th hole has been completed, as well as the first phase of replacement of protective netting. The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement. Future funding requests are for a new roof, and deck replacement. Revenues derived from course operations help offset the capital costs incurred Project is included Town of Glastonbury FY 2023-2027 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Golf Course
$1,350,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
16 Fairway Crossing, Glastonbury, CT
Related To This Project
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Jul 30 2025
Glastonbury, CT
Bid Date: Jul 25 2025
Glastonbury, CT
Bid Date: Sep 17 2025
Glastonbury, CT
Bid Date: Oct 10 2025
Glastonbury, CT
Bid Date: Jan 29 2026
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Mar 31 2026
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
Bid Date: May 08 2025
Glastonbury, CT
Bid Date: Dec 04 2025
Glastonbury, CT
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
