Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and renovation of a mixed-use development in Glastonbury, Connecticut. Conceptual plans call for the renovation of a golf course; clubhouse / community center; water / sewer project; and for site work for a water / sewer project.

Update: The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funds were utilized for trajectory studies for the #1 and #2 holes and possible netting installed. Further analysis is currently being done for potential options; cost estimates to be refined. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement and parking lot lights. Revenues derived from course operations help offset the capital costs incurred. As of May 16, 2025, this project is included in the city's 2026-2030 Improvement Program (CIP). ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://www.glastonburyct.gov/home/showpublisheddocument/40931/638095418132130000 Restoration of the primary irrigation pond on the 9th hole has been completed, as well as the first phase of replacement of protective netting. The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funds will be utilized for trajectory studies for the #1 and #2 holes and possible netting installed. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement. Revenues derived from course operations help offset the capital costs incurred. Project is in Town of Glastonbury capital budget 2024-2028 CIP 59 _______________________________________________________________________________________________________________________________ Restoration of the primary irrigation pond on the 9th hole has been completed, as well as the first phase of replacement of protective netting. The Town-owned Minnechaug Golf Course needs additional improvements to help ensure its continued viability. Such improvements include upgrades to the pump station and irrigation system, as well as continue protective netting and plantings on the first hole. The highest ranked priority was to complete a comprehensive analysis of the existing irrigation system to evaluate options and associated costs and implement necessary upgrades, which was completed in the spring of 2021. Current funding is available for initial improvements to the irrigation system. Additional funding is requested based on the results of the irrigation analysis. Estimated costs in future years are subject to adjustment. A phased approach is envisioned. Current funding requests also include several clubhouse improvements such as the continuation of the window replacements, and steps repair/replacement. Future funding requests are for a new roof, and deck replacement. Revenues derived from course operations help offset the capital costs incurred Project is included Town of Glastonbury FY 2023-2027 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Golf Course

$1,350,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
24
Bidding Soon
4,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

16 Fairway Crossing, Glastonbury, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.