Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Chester, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.
**As of May 15, 2024, the project was awarded to Western Municipal Construction in the amount of $8,649,085.** Rocky Boy's/North Central Montana Regional Water System Project Chippewa Cree Construction Corporation Description of Project: The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to construct site improvements at the new Rocky Boy's WTP Phase 1 site accordance with the plans and specifications. This bid package is part 4 of a multiple bid package project that generally comprises the following: General Construction The General Construction Contract #4 consists of the following improvements: *Site Work generally includes construction of improvements. *The installation of site pipe ranging from 1 1/2" to 36" with appurtenances, precast manholes, valves, etc. *Interior grouting of joints on cement mortar lined steel pipe *Installation of cathodic protection systems *Making connections to existing pipe/utilities *Construction of new onsite Septic System *Final site grading, street signage, and road completion (Asphalt pavement is a bid alternate) *Landscaping and seeding *Exterior site lighting *Electrical work generally consists of buried conduits, cables, and other connections *The Contractor shall have the following minimum qualifications: The buried pipeline contractor shall have completed similar work to include the installation of steel pipe with a diameter of 24" or larger. All Work shall be done according to the Bidding Documents. Technical bid questions shall be directed to Mr. David. Carlson, PE at 406-702-7716 or email at david.carlson@ae2s.com. Neither Buyer nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. All Bids shall be prepared according to the Instruction to Bidders contained within the Project Manual. Each Bid shall be accompanied by A SEPARATE ENVELOPE containing Bidder's Security (and other documentation as outlined in Article 3 - Qualifications of Bidders, as printed in the Instructions to Bidders), payable to the Chippewa Cree Construction Corporation, in a sum equal to ten percent (10%) of the full amount of the Bid, executed by the Bidder as principal and by a surety company authorized to do business in the State of Montana, conditioned that if the principal's Bid be accepted and the contract awarded, principal, within fifteen (15) days after Notice of Award, will execute and effect a Contract in accordance with the terms of the principal's Bid and a Contractor's Bond as required by the laws of the State of Montana. Only Bids that are accompanied by such a Bond (and other Qualifications) will be considered. Successful Bidders will be required to furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Insurance, as required, shall be provided by the successful Bidders and certificate(s) of that insurance shall be provided. All Bidders shall strictly follow the directions outlined in the Instructions to Bidders when submitting their bid. The project will be funded with federal funds from the Bureau of Reclamation (BOR). The ensuing contract between Owner and Contractor requires conformance with all requirements of participating funding agencies, generally outlined in Section 00 73 40 - Funding Agency Special Provisions. Bidder shall be responsible for understanding its responsibilities under each of these participating funding agencies. Those requirements include, but are not limited to, the following: *The Montana Department of Labor and Industry Requirements *DBE Subcontractor Solicitation Requirements *Wage Determination Requirements (Davis Bacon and Montana prevailing wage) *Gross Receipts Withholding Requirements *TERO Requirements *Equal Employment Opportunity Requirements Under Executive Order 11246 *Contractor Eligibility and Certification Regarding Debarment *All Bids will be made on the basis of cash payment for such work. The Chippewa Cree Construction Corporation reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contract in the best interests of the Chippewa Cree Construction Corporation. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening. The work for each contract must be completed in accordance with the dates outlined in the Agreement. The Work shall be substantially completed by October 24, 2025, and shall be completed and ready for final payment on or before December 19, 2025. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$8,649,085.00
Public - Federal
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
May 20, 2024
4600 S Tiber Rd, Chester, MT
Related To This Project
Chester, MT
Bid Date: Aug 10 2023
Chester, MT
Bid Date: Feb 04 2022
Chester, MT
Bid Date: Mar 03 2022
Chester, MT
Bid Date: Nov 15 2023
Chester, MT
Bid Date: Apr 22 2024
Chester, MT
Bid Date: Sep 05 2024
Chester, MT
Bid Date: Aug 12 2024
Chester, MT
--
Chester, MT
Bid Date: May 10 2022
Virginia City, MT
Bid Date: May 23 2023
Billings, MT
Bid Date: May 02 2023
Libby, MT
Bid Date: Apr 12 2023
Helena, MT
Bid Date: Apr 25 2023
East Helena, MT
Bid Date: Apr 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.