BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Rufus, Oregon. Completed plans call for the renovation of a military facility.

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Generator Cooling Water System Rehab at John Day Dam, Rufus, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract. Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement to replace generator air cooler, header and drain piping. The work also includes the installation of modulating valves and associated controls to generator air cooler and thrust bearing discharge heard lines as well as replacing existing flow gauges for the generator air coolers and thrust bearing coolers with ultrasonic or electromagnetic technology. The described work is to be conducted on 16 units. Background: The John Day Powerhouse is located on the Columbia River, 112 miles east of Portland, Oregon, and is the third largest hydro-electric facility in the United States, with its 16 generators having a total capacity of 2408MW. The powerhouse lies on the border between Oregon and Washington. Units 1 to 14 are in Oregon while Units 15 and 16 are in Washington. This project is being performed to prevent or reduce water infiltration into the main unit generator windings to eliminate future failures. Since 2014, three main unit generators at John Day Powerhouse have experienced winding failures on startup that have been linked back to water infiltration into the generator windings. The purpose of this project is to minimize water leaks in the generator barrel, reduce condensation and improve water drainage. Water leaks from the generator air cooler vent pipes will be eliminated by replacing the problematic 1/2 inch overhead copper piping. This piping will be replaced with stainless tubing using compression or flared type connections. Soldered connections directly over the air coolers will be replace with flexible hose. This will reduce possible leak points and eliminate vent port alignment issues when swapping out coolers. The main units were designed without modulating or automatic shut off valves, despite modulating valves being standard on other government dams at time of John Day construction. Condensation will be reduced by adding modulation valves to the generator air cooler and thrust bearing oil cooler water discharge. Also, discharge flow meters will be replaced with new to eliminate the costly calibration issues with the existing devices. These modulating valves and flow meters will require associated controls and PLCs to integrate into the existing DDC system. Contract Period of Performance: The estimated Period of Performance for this contract is 742 days after Notice to Proceed Magnitude of Construction: The estimated cost of the project is $5,000,000 to $10,000,000. Please see attached. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Renovation

33

18

46

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
91
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

January 13, 2025

img_map_placeholder

Multiple Locations, Rufus, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.