Site work and paving for a civil project in Shorewood, Wisconsin. Completed plans call for site work for a 4,200-square-foot road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

1. Installation of erosion control measures. Including removal costs upon completion. 2. Construct 4,200 square-foot Site access road to slope face and lower retaining wall without disturbing existing retaining wall structures. 3. Installation of GeoPier SRT(R) plate piles on failed slope across an area of 3,000 square feet. 4. General excavation and removal of approximately 40 cubic yards of existing on-site soils or materials. 5. Construction of 140 linear feet of trench drains. 6. Construction of 75 linear feet of drain tile connected to existing stormwater drop shaft. 7. Shop drawings and construction of 400 square-foot, pressure treated lumber fence adjacent to lower retaining wall. 8. Slope surface clearing, grubbing, grade restoration, and implementation of Vegetation Management Plan (VMP) across 8,700 square feet. 9. Removal of 4,200 square-foot Site access road. 10. Landscape restoration of 4,200 square feet of seed and top- soil. a bid bond or certified check payable to the Village of Shorewood equal to 5% of the largest possible total bid. The Site is located in the Northeast 1/4 of Section 3 of Township 7 North and Range 22 East of the 4 th Principle Meridian in Milwaukee, County, Wisconsin. An approximately 120-foot-tall bluff is located along the eastern extent of the property between the existing residence and Lake Michigan shoreline. The subsurface conditions of the bluff in this area generally consist of native clayey till deposits with interbedded layers of permeable sand and silt. The storm sewer outfall and drop shaft are located approximately 35 to 40 feet in elevation below the crest of the bluff. As part of the storm sewer repair performed in 2021, several wood retaining walls, a riprap swale, and shoreline stone armoring were installed at the Site. Since completion of the 2021 repairs, the slope between two of the wood retaining walls has experienced surface erosion and excessive slope movement. The lower retaining wall, below the slope movement, has also tilted eastward and the wood lagging has cracked in areas.

Award

Roads / Highways

$448,965.00

Public - County

Paving, Site Work

18

11

4

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
46
Bidding Soon
990
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

August 14, 2023

img_map_placeholder

Multiple Locations, Shorewood, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.