Site work for a civil project in Cannon Beach, Oregon. Completed plans call for site work for a water / sewer project.

The project consists of the construction of or improvements to reservoir tanks, valves, and watermain pipe as it relates to seismic activities. An addition of an isolation valve to aid in dividing the city's water system into smaller zones in case of a seismic emergency. All bidders shall submit, in a separate, sealed envelope, within two working hours of the bid opening time, on the bid date, a completed First-Tier Subcontractor Disclosure Form in compliance with ORS 279C.370. In general, the elements of work include, but are not limited to: Removal of roadway materials and watermain structures, valves and piping. Site Grading Watermain Reservoir Improvements Isolation Valve Installation Electrical Controls Installation Shake Alarm System Responsive bidders shall demonstrate proven experience working around sensitive, critical infrastructure like watermains, reservoirs, seismic control panels, work within City limits, etc. This PROJECT IS subject to both Prevailing Wage Rates and Davis Bacon. All bidders shall comply with the provisions of ORS 279C.800-870 [workers on public works to be paid not less than prevailing rate of wage for projects over $50,000.00] and the Federal Department of Labors Davis-Bacon Wage Determination. Contractors submitting bids are required to be registered with the Construction Contractors Board. Statements made by the Citys Representative OR City Personnel at the conference are not binding on the City unless confirmed by written addendum by the City. Bid security in the amount of not less than 5% of the bid must accompany each bid in accordance with the Instructions to Bidders. The Owner reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, may reject a bid that does not comply with requirement to demonstrate bidders responsibility under ORS 279C.375(3)(b), and may reject, for good cause, any or all bids upon a finding of the Owner that it is in the public interest to do so in accordance with ORS 279C.395. The Owner reserves the right to waive any bid irregularities or informalities. No bidder may withdraw or modify the bidders bid after the hour set for the opening thereof, until after the lapse of 30 days from the bid opening. The selected contractor and all contractors performing work within the City are required to obtain a City business license prior to start of work.

Award

Water / Sewer

$663,480.00

Public - City

Site Work

31

18

22

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
525
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

January 15, 2024

img_map_placeholder

To Be Determined, Cannon Beach, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.