BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Portsmouth, Virginia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to install finished concrete pad, remove and haul away broken concrete located at USCG Base Portsmouth, 4000 Coast Guard Blvd., Portsmouth, VA 23703. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award. See schedule in scope of work. 3. SCOPE OF WORK: Contractor is to provide all labor and materials to install approximately 741 sq.ft. of finished concrete pad and excavate a remove approximately 130 sq.ft. of cracked and broken concrete. Refer to Attachment 1 for the location details. The new pad is outlined in blue, the area to be removed is in red. This area is located on USCG Base Portsmouth Virginia. Prepare site by removing existing concrete (sawcut), dirt and debris (contractor to haul away) to proper depth and install according to the Concrete Detail. The concrete pad is approximately 741 sq. ft (13'X 57'). Attachment 1 has an overhead picture of the work area with concrete pad are to be installed in blue. The broken concrete to be removed is marked with a red X. Poured Concrete: Compact subgrade and place nonwoven filter fabric on top of subgrade. Place approximately 6 inches of crushed rock on top of fabric and compact. Concrete is to be reinforced welded wire fabric or with #4 steel rebar with a spacing of approximately 12" spacing. A joining plan must be provided by the contractor for attaching the new slab to the existing slab. Expansion joints must be installed where applicable and sawcut control joints cut to a min of 1/3 of total thickness every 6'. Concrete is to be placed inside designated area, the estimated thickness of the concrete is to be 6" or equal to that of what is already in place at 5,000 PSI with fiber. The driveway should be sloped towards the street for proper drainage and even with existing roadway curb. All concrete is to have a broom finish. Surface finish is to match the surrounding concrete areas. Contractor is to spray on curing compound after broom finish of the surface. A detailed diagram from construction drawings will be included in the concrete detail. Work area is to be left clean daily and when job is completed. Final grading and seeding of effected areas is to be done by the contractor. Contractor shall manage and dispose of all wastes resulting from their operations in accordance with applicable local, state, and federal requirements. The Contractor shall perform the onsite work during the normal operational hours of 7:00 am and 4:00 pm Monday through Friday except Federal Holidays. Hayden Heyer must approve any deviation from normal hours 24 hours in advance. 4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Hayden Heyer, 757-284-6873 or gary.h.heyer@uscg.mil. 5. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer's QAE representative and Point of Contact for this project Hayden Heyer, 757-284-6873 or gary.h.heyer@uscg.mil. Inquiries concerning any phase of the specification before or after award shall be made to Hayden Heyer, 757-284-6873 or gary.h.heyer@uscg.mil. 6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. 7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer's QAE representative of his intended start date. The work shall be done in accordance with the specification. 8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws. 11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. 12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station's regular hours, he may submit his request in writing to the Contracting Officer's QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress. 13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work. 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address and last four (4) of SSN. The Base Portsmouth Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair. 15. SAFETY REQUIREMENTS: Responsibilities: All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work. Written notification must be provided to the Base Safety Officer, Noah Reinhart (757-638-2793 or Cell 757-641-7854) in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. The systems on Base Portsmouth are not limited to what the City of Portsmouth has on file. In order to ensure electrical safety and integrity of systems, a facility chit is required. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs. Rights: Every employee working on Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE's and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations. 16. ENVIRONMENTAL PROTECTION REQUIREMENTS: All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Jon Cooper (757)483-8293 prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
40
Bidding Soon
670
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2023

September 11, 2023

img_map_placeholder

4000 Coast Guard Blvd, Portsmouth, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.