BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2023 at 7:00 PM

Updated May 25, 2024

Site work and renovation of a mixed-use development in Fontana, California. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and sidewalk / parking lot.

As of November 14, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The project consists of rehabilitating the existing Tamarind and Industry sanitary sewer pump station. Work includes removing existing electrical equipment, pumps, piping, fences, concrete, asphalt, top slabs, wet well liner, and building, pipe abandonment, and installation of new pumps, piping, standby generator, odor control system, top slabs, hatches, wet well supports, coating wet wells and manhole, fences, gates, shade structure, and electrical equipment (site lights, control panels, termination cabinet), and miscellaneous site improvements. Estimated Bid Value $3,800,000.00 Project Duration: 260 Working Days Bid bond payable to the city executed by the Bidder as principal and surety as obligor in an amount not less than 10% of the maximum amount of the Bid. The cash, check or Bid Bond shall be given as a guarantee that the Bidder shall execute the Contract if it be awarded to the Bidder. Performance Bond and Payment (Labor and Material) Bond, each in an amount equal to one hundred percent (100%) of the Total Bid Amount and in the form supplied by the City and included in the Contract Documents. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of ninety (90) calendar days. License Requirements Class A contractor's license or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work. Liquidated Damages The sum of $2,500 for each consecutive calendar day in excess of the time specified for completion of the Work, as adjusted in accordance with 6-4, the Contractor shall pay to the Agency, or have withheld from monies due it. Q&A Deadline 09/06/2023 2:00 PM (PDT) *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$4,609,361.00

Public - City

Renovation, Site Work

63

24

2

6

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
259
Bidding Soon
3,748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

November 13, 2023

Project location map

Multiple Locations, Fontana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.