EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Allenwood, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Fog Seal Furnish and place approximately 54,000 SY of asphalt fog seal. A bid bond or certified check in the amount of 10% of the contract will be required at the bid opening. Payment and Performance Bonds in the amount of 100% of the contract, as well as proof of workmen's compensation insurance, will be required within 20 days of receiving notice of being awarded the contract on each bid. All work and material must meet current online specifications Form 408 and its supplements. Gregg Township reserves the right to reject any or all proposals. Asphalt Fog Seal For Asphalt Seal Coats This work is the treatment of an asphalt seal coat with an application of asphalt material and an application of fine aggregate. All work and material in accordance with the current Publication 408 Section 472. It is the contractor responsibility to sweep all loose aggregate and dispose of properly prior to the Fog Seal application. Incidental to the above items: is mobilization; cleaning and sweeping the roadway prior to placement; provide affidavit showing aggregate and oil compatibility and provide Traffic Control according to Pub. 213. All work must be completed in accordance with the current PA DOT Pub. 408 Specifications and its supplement.

Award

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Seal Coats
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
72
Bidding Soon
836
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2023

October 5, 2023

img_map_placeholder

Multiple Locations, Allenwood, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Fog Seal

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.