Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in St Pete Bch, Florida. Completed plans call for site work for a water / sewer project.
Question Deadline 10/18/2023 at 10:00 AM ET Addendum 1 extended deadline for questions from 10/11/23. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager and shall be received The Contractor shall furnish all labor, material, equipment and incidentals necessary for Pump Station 1 Rehabilitation including, but not limited to, temporary by-pass pumping, dewatering, force main and gravity main connections, testing, pavement restoration, maintenance oftraffic, and construction of new force main, lift station, gravity main, manholes, odor control equipment, elevated platforms, driveways, valves, and appurtenances. The work shall also include furnishing all labor, material, and equipment necessary for site restoration including but not limited to fill replacement, landscaping, irrigation, grading, pavement repair and replacement, pavement striping, and concrete curb installation. The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, shop drawings, working drawings and other means of construction necessary or proper for performing and completing the work. The Contractor is responsible for obtaining all required permits necessary for the work, including all applications and review fees, other than those permits which may have already been obtained. The Contractor shall perform and complete the work in a speedy and efficient manner consistent with safety of life and property and to the satisfaction of the City, and in strict accordance with the Contract Documents. The Contractor shall repair or restore all structures and property damaged or disturbed during performance of the work. The cost of incidental work described in this General Section, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the work and shall be included in the prices for the various Contract Items. No additional payment will be made. The Contractor shall be solely responsible for the means and methods of construction and the adequacy of his workmanship, materials and equipment. Working drawings and sketches showing work location, pump location, piping layout & routing. Show all proposed encroachment and access impacts on adjacent properties or facilities. Pump, control, alarm and pipe specifications or catalog cuts. Detailed sketch of controls and alarm system. Power requirements and details on methods to provide by-pass power or fueling. Calculation and determination of response times to prevent an SSO after a high-water alarm. Procedures to be taken in case of power, pump, or piping failures; including contact names and numbers for emergency notifications. Frequency and specific responsibility for monitoring pump operation, fuel levels, pump maintenance and entire length of piping
Post-Bid
Water / Sewer
$1,413,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 26, 2023
November 27, 2023
8665 Boca Ciega Dr, St Pete Bch, FL
Related To This Project
St Pete Bch, FL
Bid Date: Feb 07 2024
St Pete Bch, FL
Bid Date: Feb 12 2024
St Pete Bch, FL
Bid Date: Feb 29 2024
St Pete Bch, FL
Bid Date: Mar 13 2024
St Pete Bch, FL
Bid Date: Mar 07 2024
St Pete Bch, FL
Bid Date: Mar 21 2024
St Pete Bch, FL
Bid Date: Mar 26 2024
St Pete Bch, FL
Bid Date: Apr 02 2024
St Pete Bch, FL
Bid Date: Oct 17 2023
St Pete Bch, FL
Bid Date: Mar 24 2022
St Pete Bch, FL
Bid Date: Aug 25 2023
St Pete Bch, FL
Bid Date: Jul 11 2023
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Apr 05 2023
St Pete Bch, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.