BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in St Pete Bch, Florida. Completed plans call for site work for a water / sewer project.

The company that is submitting a bid declares that it has extensive experience in Seawall Construction and Design. The undersigned, as Bidder, hereby declares that the only person or persons interested in the Bid as principal or principals are named herein, and that no person other than herein mentioned has any interest in the Bid or in the Agreement to be entered into; that this Bid or Agreement is made without connection with any other person, company, or parties making a Bid; and that it is in all respects fair and in good faith without collusion or fraud. The Bidder further declares that they have examined the site of the work and informed themselves fully in regard to all conditions pertaining to the place where the work is to be done; that they have examined the Plans and Specifications for the work and Contract Documents relative thereto, and have read all special provisions furnished prior to the opening of bids; and that they have satisfied themselves relative to the materials to be supplied and work to be performed. The Bidder proposes and agrees, if the Bid is accepted, to contract with the City of St. Pete Beach, Florida, in the form of an Agreement specified for "29th Avenue Seawall Cap Replacement and Extension" in St. Pete Beach, Florida, in full and complete accordance with the shown, noted, described, and reasonably intended requirements of the Plans, Specifications, and Contract Documents, to the full and entire satisfaction of the City of St. Pete Beach, Florida. The successful bidder shall be required to utilize the template Agreement in this Request for Bids (RFB) and any questions regarding the Agreement must be addressed during the RFB process before submittal. The City reserves the right to respond or not respond to questions in the form of an addendum. The Bidder proposes to furnish all materials, equipment, labor, and perform the work submitted in their bid schedule for the City of St. Pete Beach "29th Avenue Seawall Cap Replacement and Extension". The City of St. Pete Beach is soliciting bids from qualified Contractors for the 29th Avenue Seawall Cap Replacement and Extension. All Contractors must contact the City's Procurement Manager, in writing via e-mail (jtaylor@stpetebeach.org), with their intention to bid, along with their company name and contact information at least five (5) business days before the bid package is due. The City is not responsible for any Addendums or other supplementary information that is not received due to non-submittal of the aforementioned information. Question Deadline 01/24/2024 at 10:00 AM ET No oral interpretations will be made to any firms as to the meaning of the scope of work or any other contract documents included in this RFB. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager No oral interpretations will be made to any firms as to the meaning of the scope of work or any other contract documents included in this RFB. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager and shall be received no later than 10:00 AM EST on 1/24/2024. Responses to questions may be handled as an Addendum if the response provides clarification to the requirements of the RFB. All such Addenda shall become a part of the contract documents. The City will not be responsible for any other explanation or interpretation of the proposed RFB made or given prior to the award of the contract. The City will not respond to questions received after the specified deadline. The City reserves the right to respond to any and all questions but is not required to do so. This Work Involves Furnishing All Labor, Equipment, Materials, and Incidental Items Necessary to Rebuild the 29th Avenue Seawall for the City of St. Pete Beach, Fl. This Work May Require the Contractor to Saw Cut, Excavate Material, Prepare and Compact Subgrade and Base Lifts, Demo and Replace and/ or Rehabilitate the Seawall at Each Location, Place and Compact and Dispose of Any Debris Generated by the Work. Detailed Specifications o the Contractor Shall Carefully Examine the City Row and Be Familiar With the Work Required for the Project. Investigate All Site Conditions That May Affect Execution of the Work as Detailed in the Bid Documents. Contact the City's Public Works Department for Changes or Alterations Before Proceeding. Contractor is Responsible for Field Measurement and Review of Existing Conditions. o Contractor is Responsible for All Utility Locates Through Sunshine One-call. o Site and Surrounding Properties Must Be Kept Free of Debris and Thoroughly Cleaned Upon Completion. o All Work to Be Completed Within City Property or City Right-of-way. o Equipment Left on Site Must Be Approved by the Public Works Department. o Barricades, Cones, and/or Traffic Control Activities, All Mot Requirements Are the Responsibility of the Contractor. Public Notification (via Door Hanger or Mailings) Are the Responsibility of the Contractor. o Contractor is Responsible for All Demolition and Construction Within the Project Limits as a Direct Result of Work Performed Under This Contract. All Disturbed Areas Are to Be Patched Back Equal to or Better Than the Existing. o Contractor is Responsible for Field Measurement.

Award

Water / Sewer

$61,950.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
49
Bidding Soon
862
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

March 13, 2024

img_map_placeholder

29th Ave, St Pete Bch, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.