BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work and renovation of a civil project in Boiling Spring Lakes, North Carolina. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

As of August 8, 2025, project was awarded to King Construction Services, awarded amount is $23,054,203.5 Longwood Road Sewer, DWI Project A general description of the work includes, without limitation: The extension of the County's wastewater collection system to serve previously unserved residents in the vicinity of Longwood Road with the construction of approximately 51,200 LF of 12-inch force main, 85,000 LF of low pressure sewer pipe, 1,200 LF of 8-inch gravity sewer, and sewer connections with grinder pumps and associated appurtenances, as well as an anchor lift station at Waccamaw School. Est. Value: $ 20,400,000.00

Award

Water / Sewer

$23,054,204.00

Public - County

Renovation, Site Work

121

14

30

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
46
Bidding Soon
557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

August 4, 2025

Project location map

Longwood Rd, Boiling Spring Lakes, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.