BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2023 at 7:00 PM

Updated January 29, 2024

Site work and new construction of a water / sewer project in Worthington, Kentucky. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The City of Worthington is seeking proposals for the construction of a new, partially enclosed metal building at the Sewer Treatment Plant. The estimated size of this building will be 100' x 60' and enclosed on three sides with a 16' internal clearance. This project will include no paving save any footers needed to support the structure. This project is funded through the state Cleaner Water Grant Funds.

Post-Bid

Water / Sewer

$440,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

February 5, 2024

Project location map

To Be Determined, Worthington, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.