BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cottonwood Heights, Utah. Contact the soliciting agency for additional information.

The estimated annual dry weight equivalent of sodium hydroxide used at LCWTP is 1,350,000 pounds (lbs.). The District is a wholesale provider of treated water to Salt Lake City Public Utilities Department, Sandy City Public Utilities Department, and others. The District owns and operates two (2) water treatment plants, the Little Cottonwood Water Treatment Plant (LCWTP) and the Point of the Mountain Water Treatment Plant (POMWTP), (collectively called the Treatment Plants). The Treatment Plants have full conventional treatment. Sodium hydroxide is used primarily for pH adjustment at the LCWTP. It may be used at the POMWTP in the future. The estimated annual dry weight equivalent of sodium hydroxide used at LCWTP is 1,350,000 pounds (lbs.). The estimated annual dry weight equivalent of sodium hydroxide used at POMWTP is 80,000 lbs. Numbers were calculated using a 50 percent (%) solution as the reference solution. Actual quantities will vary. Forces of nature, raw water quality, and other factors will determine the amount of sodium hydroxide required. For a more complete description of product and/or service requirements refer to Exhibit A of the attached Sample Agreement. Because of the volatility in pricing for raw materials and other factors, contracts will be limited to a one-year term. Prices are to remain fixed for such term.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
31
Bidding Soon
528
All Active Projects
252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 4, 2024

img_map_placeholder

Multiple Locations, Cottonwood Heights, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.