BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Hood River, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of March 19, 2024, the project was awarded to Beam Excavating for $1,296,950.00.** The work to be done under this contract includes construction of approximately 1,000 linear feet of new water main, water services, appurtenance, and pressure reducing station; construction of approximately 1,000 linear feet of new sewer main, sewer services, and appurtenances; sidewalk and curb surface restoration; abandonment of existing water and sewer facilities, connections to existing facilities, sewer bypass pumping, curb ramp replacement, and a full road reconstruction. All work is located in Hood River, OR. The project area of work is in the vicinity of Montello Avenue midblock between 7th Street and 4th Street to east of 2nd Street, and 2nd Street between Montello Avenue and Prospect Avenue.. The work is more particularly described in the project plans. Question Deadline 02/02/2024 at 5:00 PM PT The Project has been designed by Grayling Engineers. Inquiries concerning the contents of the plans, specifications and bidding documents should be directed to Randy Achziger, Project Manager for the City of Hood River (541.436.3510), or r.achziger@cityofhoodriver.gov Est. Completion Date: Sept. 16, 2024 Est. Value Notes: 1,670,000.00 Site Address: Montello Avenue

Award

Roads / Highways

$1,296,950.00

Public - City

Paving, Site Work

36

6

12

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
523
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

April 1, 2024

img_map_placeholder

Montello Ave, Hood River, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.