Published July 15, 2024 at 8:00 PM

Updated July 16, 2024

Site work, paving and outdoor lighting for a mixed-use development in Barneveld, Wisconsin. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a playground / park / athletic field; and sidewalk / parking lot.

**As of April 18,2024 has not yet been awarded. A timeline for the award has not yet been established.** Question Deadline 02/20/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Marcus Rue, P.E., mrue@msa-ps.com Questions received less than seven days prior to the date for opening of Bids may not be answered The Project includes the following Work: o Removals: excavation common, landscaping, existing asphalt parking lot/sport court, clearing and grubbing and existing site amenities. o Erosion Control: Erosion mat, turbidity barrier, silt fence maintenance, sediment logs, and stormwater swales. o Site Improvements: Concrete sidewalk improvements, detectable warning fields, thickened edge concrete sidewalk, asphalt parking lot paving, curb and gutter, pavement marking, dense grade base, park benches, stone block benches, picnic tables, bike racks, bollards, ADA playground, ADA splashpad, park sign, site memorial, sport court with chain-link fence and basketball hoop, and site signage. o Electrical: Electrical service, site lighting and underground conduit. o Utilities: o New sanitary sewer service and service connection o New water service, salvage and reinstall hydrant, and service connection o New electrical service and connection o Stormwater area and trench drains, Nyloplast structures and bio-infiltration basins o Directional boring under DNR Trail Building: 1) Core Shelter: The building includes restrooms, utility chase and splashpad utility chase. Building will have concrete foundations, masonry walls and sloped wood roof trusses. 2) Shelter Upgrades: optional enclosed gathering room, and proposed metal roofing. o Site and Turf Restoration: Site and turf restoration, plantings, general site cleanup and amenities installed. o Proposed Schedule: tentatively award the work by March 4, 2024. Substantial project completion is desired for seeding by late September 2024 and for the building and other work by mid-May 2025.

Award

Sidewalks / Parking Lot

$1,549,469.00

Public - City

Outdoor Lighting, Paving, Site Work

84

29

8

16

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
56
Bidding Soon
1,081
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 20, 2024

Project location map

To Be Determined, Barneveld, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.