BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 29, 2024 at 7:00 PM

Updated March 1, 2024

Site work and paving for a mixed-use development in Springfield, Massachusetts. Completed plans call for site work for a educational facility; playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of February 29, 2024, this project has not yet been awarded. A timeline for award has not yet been established. New Playground Facilities at Sumner Avenue Elementary School. Installation of sediment & erosion controls; bituminous and cement concrete pavement; drainage; earthwork; installation of owner-supplied playground equipment, and furnishings; fencing; coordination with Owner's poured-in-place safety surfacing vendors; site restoration and landscaping. Please contact Anja Duffy, GZA, Inc; anjaduffy@gza.com with inquiries concerning the pre-bid site visits. These meetings will provide an opportunity for interested parties to inspect the sites and all particulars and resolve questions regarding the scope of work, existing conditions and the specifications. Questions must be submitted in writing to the City (nwalker@springfieldcityhall.com) by close of business on February 9, 2024 in order to be considered. DESCRIPTION OF WORK A. Contractor shall provide control of site access and activities, mobilize personnel, equipment, and materials to the project site, install erosion controls, provide maintenance of the project area and facilities in existing condition or better, and coordinate with the Engineer as required by the specifications or as deemed necessary by the Engineer. B. The Contractor shall keep a record set of prints on which they are to record all approved changes and/or additions to the work made to meet field conditions. This set of drawings is to be given to the Owner at the completion of their work for their use. C. The Contractor shall have a minimum of five years experience in site construction and installation of playground equipment. References shall be provided with the bid. D. Substantial Completion shall be attained by August 5, 2024, and Final Completion by August 19, 2024. Liquidated damages at $1,000 per day shall apply for non-completion by the final completion date.

Bid Results

Educational

$335,544.00

Public - City

Paving, Site Work

15

11

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
646
Active Projects
126
Bidding Soon
5,050
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

Project location map

45 Sumner Ave, Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.