BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Palm Bay, Florida. Contact the soliciting agency for additional information.

The objective of this work is for vendors to supply road base material (coquina or limerock) to the Buck Lake Conservation Area (see attached map). The District anticipates purchasing 3,000 tons of limerock to refurbish the travel surfaces. Contractor shall supply and deliver limerock (trucking included) with certified weight tickets at the time of delivery. The material should generally meet Florida Department of Transportation Specifications for stabilized road base but does not need to be FDOT certified. However, the moisture content and the gradation schedule shall be met as defined below. The District reserves the right to inspect the material to ensure the quantity and quality meets the District's minimum requirements prior to award. INTRODUCTION BACKGROUND The Land Management group routinely requests that the Bureau of Operations and Maintenance assist in enhancing public/district access on District properties that are used for recreational activities, maintenance and repairs or infrastructure improvements. One such project is improvements to roadways within the Buck Lake Conservation Area. Upon completion of the project, the roadways should be more sustainable and require less long-term maintenance. OBJECTIVE The objective of this work is for vendors to supply road base material (coquina or limerock) to the Buck Lake Conservation Area (see attached map). The District anticipates purchasing 3,000 tons of limerock to refurbish the travel surfaces. SCOPE OF WORK Contractor shall supply and deliver limerock (trucking included) with certified weight tickets at the time of delivery. The material should generally meet Florida Department of Transportation Specifications for stabilized road base but does not need to be FDOT certified. However, the moisture content and the gradation schedule shall be met as defined below. The District reserves the right to inspect the material to ensure the quantity and quality meets the District's minimum requirements prior to award. Further information is available through electronically. The objective of this work is for vendors to supply road base material (coquina or limerock) to the Buck Lake Conservation Area (see attached map). The District anticipates purchasing 3,000 tons of road base material to refurbish the travel surfaces. The estimated budget for this project is $95,000 (not-to-exceed). Staff's recommendation of award will be presented to the District's Executive Director. All materials are expected to be delivered by June 30, 2024. Americans With Disabilities Act (ADA) The District does not discriminate on the basis of disability in its services, programs, or activities. Special accommodations for disabilities may be requested through Amy Lucey, Senior Procurement Specialist, or by calling (800) 955-8771 (TTY), at least five business days before the date needed. All inquiries related to this solicitation may only be directed to the Senior Procurement Specialist: Amy Lucey, Senior Procurement Specialist Phone: 321-409-2156 Email: ALucey@sjrwmd.com Delivering all files on a single pin/thumb/jump drive either by mail or hand-delivery in a sealed envelope labeled as follows: SEALED BID - DO NOT OPEN Respondent's Name: Invitation for Bid: 39381, Amy Lucey Senior Procurement Specialist St. Johns River Water Management District Palm Bay Service Center 525 Community College Parkway SE Palm Bay Florida 32909 Do not submit your bid by email -- this will result in the bid being rejected as nonresponsive. District staff are not authorized to orally interpret the meaning of the specifications or other Agreement documents, or correct any apparent ambiguity, inconsistency, or error therein. In order to be binding upon the District, the interpretation or correction must be given by the Procurement Specialist and must be in writing. The Procurement Specialist may orally explain the District's procedures and assist Respondents in referring to any applicable provision in the Invitation for Bids documents, but the Respondent is ultimately responsible for submitting the Bid in the appropriate form and in accordance with written procedures. Question Deadline 02/20/2024. Every request for a written interpretation or correction must be received at least nine days prior to opening of Bids in order to be considered. Requests may be submitted by fax at 321-722-5357 or by email at ALucey@sjrwmd.com. Interpretations, corrections, and supplemental instructions will be communicated by written addenda to this solicitation posted electronically to all prospective Respondents (at the respective addresses furnished for such purposes) no later than five days before the opening of Bids. Submission of a Bid constitutes acknowledgment of receipt of all addenda. Bids will be construed as though all addenda had been received. Failure of the Respondent to receive any addenda does not relieve Respondent from any and all obligations under the Bid, as submitted. All addenda become part of the Agreement. Bids must be delivered to the specified location and received before the Bid opening in order to be considered. Untimely Bids will be returned to the Respondent unopened. Bids will be considered irregular and may be rejected if they show material omissions, alterations of form, additions not called for, conditions, limitations, or other material irregularities. The District may consider incomplete any Bid not prepared and submitted in accordance with the provisions specified herein, and reserves the right to waive any minor deviations or irregularities in an otherwise valid Bid. The District reserves the right to reject any and all Bids and cancel this request for qualifications when it determines, in its sole judgment and discretion, that it is not in its best interest to award the agreement. LIQUIDATED DAMAGES: If Contractor neglects, fails, or refuses to satisfactorily complete the Work by the Completion Date noted on the Contract, Contractor shall, as a part of the consideration for this Agreement, pay the District the amount stipulated herein, not as a penalty, but as liquidated damages for such breach, for each day Contractor is in default thereafter. This amount is fixed and agreed upon between the parties due to the impracticability and extreme difficulty of ascertaining the actual damages the District would sustain in such event. The amount of liquidated damages shall be one half of one percent (.5%) of the total contract amount per day. Liquidated damages shall be deducted from payments as they become due and may be deducted from the retainage due upon completion. They constitute an agreed-upon liquidated sum solely for consequential damages attributable to delay and are not a substitute for any other consequential damages incurred by the District, such as the cost of finding a replacement Contractor for completion of the Work if this Agreement is terminated by the District for non-performance. (b) Contractor shall not be charged with liquidated damages or any excess cost when the District determines that Contractor's reasons for the time extension are acceptable in accordance with FORCE MAJEURE; DELAYS; EXTENSION OF COMPLETION DATE. A written extension of the Completion Date constitutes a waiver of liquidated damages to the new Completion Date unless expressly provided therein to the contrary

Award

Playgrounds / Parks / Athletic Fields

$67,500.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
855
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 29, 2024

img_map_placeholder

Multiple Locations, Palm Bay, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.