Site work for a water / sewer project in Fort Morgan, Colorado. Completed plans call for site work for a water / sewer project.

Project Summary: This project generally consists of 8 separate projects A-H involving replacement from ductile iron/sandcast to PVC. i. Project A - Main St. between Platte Ave. & Riverview Ave. ii. Project B - Ram Ave. between S. Sherman St. & Ash St. iii. Project C - Gateway Ave. between S. Main St. & S. Sherman St. iv. Project D - Dexter Dr. between E. Burlington Ave. & Dahlia St. v. Project E - Cheyenne St. between Acoma Ave. & Arapahoe St. vi. Project F - Prospect St. between E. Railroad Ave. & E. Bijou Ave. vii. Project G - Walnut St. between W. Railroad Ave & W. Bijou Ave. viii. Project H - Karen St. between E. 6 th Ave. & E. 8th Ave All sealed bids must be addressed to: City of Fort Morgan Bid for 2024 Water Underground Infrastructure Projects Attention: Erik Sagel - and bear the name of the bidder and their address. If delivering via private courier (such as FedEx, UPS, etc.) to: 110 Main St., Fort Morgan, CO 80701. If mailed via USPS, send to: P.O. Box 100, Fort Morgan, CO 80701. If emailed, send to: cfm.bids@cityoffortmorgan.com Question Deadline 03/06/2024 at 9:00 AM MT All questions regarding this bid should go to Erik Sagel, Water Distribution Superintendent at (970) 542-3911. Questions must be in writing and can be e-mailed to erik.sagel@cityoffortmorgan.com. Project A - Main Street between E. Riverview Avenue and 7th Avenue Water Main Replacement: Construction of approximately 1,600-feet of 16-inch diameter C900 PVC waterline along Main Street between East Riverview Avenue and East 7th Avenue. The project also includes pavement removal and concrete removal and replacement, hydrant connection and replacement, installing valves, fittings, service connection materials and miscellaneous appurtenances. This project is within CDOT right-of-way and will be performed in conjunction with requirements set forth by CDOT Project B - Ram Avenue between S. Sherman Street and Ash Street Water Main Replacement: Construction of approximately 2,300-feet of 6-inch diameter C900 PVC waterline along Ram Avenue between South Sherman Street and Ash Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. Project C - Gateway Avenue between S. Sherman Street and S. Main Street Water Main Replacement: Construction of approximately 2,600-feet of 8-inch diameter C900 PVC waterline along Gateway Avenue between South Sherman Street and South Main Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. 4. Project D - Dexter Drive between E. Burlington Avenue and Dahlia Street Water Main Replacement: Construction of approximately 600-feet of 6-inch diameter C900 PVC waterline along Dexter Drive between E. Burlington Avenue and Dahlia Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Project E - Cheyenne Street between Acoma Avenue and Cherokee Street Water Main Replacement: Construction of approximately 990-feet of 6-inch diameter C900 PVC waterline along Cheyenne Street between Acoma Avenue and Cherokee Street. Construction of approximately 30-feet of 8-inch diameter C900 PVC waterline lateral is included at Acoma Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Project F - Prospect Street between W. Railroad Avenue and W. Bijou Avenue Water Main Replacement: Construction of approximately 980-feet of 6-inch diameter C900 PVC waterline along Prospect Street between East Railroad Avenue and East Bijou Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenancesProject G - Walnut Street between West Railroad Avenue and West Bijou Avenue Water Main Replacement: Construction of approximately 600-feet of 6-inch diameter C900 PVC waterline along the Walnut Street between West Railroad Avenue and West Bijou Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. Project H - Karen Street between West 6th Avenue and West 8th Avenue Water Main Replacement: Construction of approximately 770-feet of 6-inch diameter C900 PVC waterline along the Karen Street between East 6th Avenue and East 8th Avenue. The project also include pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Miscellaneous: The City's Procurement Policy is available for review in the Municipal Code, Chapter 4, Article 6, Procurement and Contract Program. The link to this policy can be found on the city's website and in the description above. There is no Performance and Payment Bond for these projects. Proposed Schedule/Workplan. Provide tentative timeline with milestone, methodology, expectations from the City (e.g. staff, data, etc.). The projects are expected to be substantially completed no later than October 1, 2024.

Award

Water / Sewer

$588,531.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
863
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 12, 2024

img_map_placeholder

Multiple Locations, Fort Morgan, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.