Site work for a water / sewer project in Fort Morgan, Colorado. Completed plans call for site work for a water / sewer project.
Project Summary: This project generally consists of 8 separate projects A-H involving replacement from ductile iron/sandcast to PVC. i. Project A - Main St. between Platte Ave. & Riverview Ave. ii. Project B - Ram Ave. between S. Sherman St. & Ash St. iii. Project C - Gateway Ave. between S. Main St. & S. Sherman St. iv. Project D - Dexter Dr. between E. Burlington Ave. & Dahlia St. v. Project E - Cheyenne St. between Acoma Ave. & Arapahoe St. vi. Project F - Prospect St. between E. Railroad Ave. & E. Bijou Ave. vii. Project G - Walnut St. between W. Railroad Ave & W. Bijou Ave. viii. Project H - Karen St. between E. 6 th Ave. & E. 8th Ave All sealed bids must be addressed to: City of Fort Morgan Bid for 2024 Water Underground Infrastructure Projects Attention: Erik Sagel - and bear the name of the bidder and their address. If delivering via private courier (such as FedEx, UPS, etc.) to: 110 Main St., Fort Morgan, CO 80701. If mailed via USPS, send to: P.O. Box 100, Fort Morgan, CO 80701. If emailed, send to: cfm.bids@cityoffortmorgan.com Question Deadline 03/06/2024 at 9:00 AM MT All questions regarding this bid should go to Erik Sagel, Water Distribution Superintendent at (970) 542-3911. Questions must be in writing and can be e-mailed to erik.sagel@cityoffortmorgan.com. Project A - Main Street between E. Riverview Avenue and 7th Avenue Water Main Replacement: Construction of approximately 1,600-feet of 16-inch diameter C900 PVC waterline along Main Street between East Riverview Avenue and East 7th Avenue. The project also includes pavement removal and concrete removal and replacement, hydrant connection and replacement, installing valves, fittings, service connection materials and miscellaneous appurtenances. This project is within CDOT right-of-way and will be performed in conjunction with requirements set forth by CDOT Project B - Ram Avenue between S. Sherman Street and Ash Street Water Main Replacement: Construction of approximately 2,300-feet of 6-inch diameter C900 PVC waterline along Ram Avenue between South Sherman Street and Ash Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. Project C - Gateway Avenue between S. Sherman Street and S. Main Street Water Main Replacement: Construction of approximately 2,600-feet of 8-inch diameter C900 PVC waterline along Gateway Avenue between South Sherman Street and South Main Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. 4. Project D - Dexter Drive between E. Burlington Avenue and Dahlia Street Water Main Replacement: Construction of approximately 600-feet of 6-inch diameter C900 PVC waterline along Dexter Drive between E. Burlington Avenue and Dahlia Street. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Project E - Cheyenne Street between Acoma Avenue and Cherokee Street Water Main Replacement: Construction of approximately 990-feet of 6-inch diameter C900 PVC waterline along Cheyenne Street between Acoma Avenue and Cherokee Street. Construction of approximately 30-feet of 8-inch diameter C900 PVC waterline lateral is included at Acoma Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Project F - Prospect Street between W. Railroad Avenue and W. Bijou Avenue Water Main Replacement: Construction of approximately 980-feet of 6-inch diameter C900 PVC waterline along Prospect Street between East Railroad Avenue and East Bijou Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenancesProject G - Walnut Street between West Railroad Avenue and West Bijou Avenue Water Main Replacement: Construction of approximately 600-feet of 6-inch diameter C900 PVC waterline along the Walnut Street between West Railroad Avenue and West Bijou Avenue. The project also includes pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances. Project H - Karen Street between West 6th Avenue and West 8th Avenue Water Main Replacement: Construction of approximately 770-feet of 6-inch diameter C900 PVC waterline along the Karen Street between East 6th Avenue and East 8th Avenue. The project also include pavement removal, traffic control, hydrant connection installing valves, fittings, service connection materials and miscellaneous appurtenances Miscellaneous: The City's Procurement Policy is available for review in the Municipal Code, Chapter 4, Article 6, Procurement and Contract Program. The link to this policy can be found on the city's website and in the description above. There is no Performance and Payment Bond for these projects. Proposed Schedule/Workplan. Provide tentative timeline with milestone, methodology, expectations from the City (e.g. staff, data, etc.). The projects are expected to be substantially completed no later than October 1, 2024.
Award
Water / Sewer
$588,531.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2024
April 12, 2024
Multiple Locations, Fort Morgan, CO
Related To This Project
Fort Morgan, CO
Bid Date: Apr 02 2024
Fort Morgan, CO
Bid Date: Mar 15 2024
Fort Morgan, CO
Bid Date: Mar 29 2024
Fort Morgan, CO
Bid Date: Apr 17 2024
Fort Morgan, CO
Bid Date: Jul 31 2024
Fort Morgan, CO
Bid Date: May 28 2024
Fort Morgan, CO
Bid Date: May 31 2024
Fort Morgan, CO
Bid Date: May 20 2024
Fort Morgan, CO
Bid Date: Mar 15 2024
Fort Morgan, CO
Bid Date: Feb 23 2024
Fort Morgan, CO
Bid Date: Jan 26 2024
Fort Morgan, CO
Bid Date: Jan 05 2024
Fort Morgan, CO
Bid Date: Dec 21 2023
Fort Morgan, CO
Bid Date: Dec 11 2023
Fort Morgan, CO
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.