BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Oregon City, Oregon. Completed plans call for site work for a water / sewer project.

Contact Information Procurement Process and Technical Questions: Ryan Rice, rrice@clackamas.us - Deadline to Submit Clarifying Questions - March 7, 2024, 5:00 PM, Pacific Time Proposal Terms: All Proposals, including any price quotations, will be valid and firm through a period of one hundred and eighty (180) calendar days following the Closing date. County may require an extension of this firm offer period. Proposers will be required to agree to the longer time frame in order to be further considered in the procurement process. BACKGROUND WES is a special district operating under an ORS 190 Partnership that produces clean water and protects water quality for more than 190,000 people living and working in Clackamas County, Oregon. WES owns and operates five resource recovery facilities, 23 pumping stations and more than 350 miles of pipes. WES serves the Cities of Milwaukie, Happy Valley, Oregon City, West Linn, Gladstone, Johnson City, and unincorporated areas within Clackamas County. The Bolton Force Main was installed in the mid 1980's and transports flow from the WES owned Bolton Pump Station in West Linn to a gravity manhole in Clackamette Park in Oregon City. It is 16" diameter and approximately 6,360 feet in length. The Bolton Force Main Pigging Project will perform progressive proof pigging to clean the force main and confirm readiness to launch the smart pig and then in-line inspection (aka "smart pigging") to inspect and assess the remaining wall thickness of the force main. The table below shows the material and dimensions of the force main to be pigged and inspected as part of this project. SCOPE OF WORK This contractor shall be responsible for providing all supporting services for pigging including but not limited to supplemental hydrant water services, sewer cleaning services and traffic control support. The CONTRACTOR tasks shall include: Project management services o Coordination, administration, and correspondence with WES and Jacobs including coordination with WES representatives to schedule and provide access to facilities, and to conduct any modifications on or operation of pump station equipment during the activities based on plans developed by the CONTRACTOR. o Project management to correspond with Jacobs and WES, prepare and submit invoices, track changes, and administrate contractor resources to perform the scope of work. o The pigging contractor shall act as the prime contractor and shall be responsible for hiring and coordination of possible subcontractors including but not limited to the following items of work: supplemental hydrant water services, sewer cleaning services and traffic control support. The prime contractor shall be responsible for ensuring all permits and contract requirements are met by any and all subcontractors. Work Schedule: All work to be completed before July 1, 2024.

Award

Water / Sewer

$500,000.00

Public - County

Site Work

25

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
1,104
All Active Projects
406
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Oregon City, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.