BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2024 at 8:00 PM

Updated April 10, 2024

Site work and paving for a mixed-use development in Hillsboro, Oregon. Completed plans call for site work for a bridge / tunnel; water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project name is: 100460 - NW Thompson Road (NW Kenny Terrace to NW Saltzman Road). The work to be done under this contract consists of the following in Washington County: -Construct full depth replacement of existing roadways. -Construct asphalt and concrete driveways. -Construct curbs, sidewalks and ADA ramps. -Install new signing, illumination, signals, and pavement markings. -Install stormwater culverts, pipes, manholes, and inlets. -Install retaining walls. -Install permanent seeding and landscaping. -Implement temporary traffic control and temporary erosion control measures. -Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is $3,000,000 - $7,000,000. Bids must include: A residency statement as defined in ORS 279C.365. A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. Bidders must complete and submit the First-tier Subcontractors Disclosure Form provided, either with the bid, or using a separate, linked solicitation on the ProcureNow site. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). First-Tier Subcontractors Disclosure Forms submitted via email will not be accepted. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. Question Submission Deadline: March 29, 2024, 5:00pm Submit questions only in writing on the County's online with the Question/Answer feature on the project page. The County reserves the right to waive any irregularities or in-formalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion- February 28, 2025

Award

Roads / Highways

$5,422,430.00

Public - County

Paving, Site Work

221

17

2

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

June 3, 2024

Project location map

Thompson Road, Hillsboro, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.