BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work for a water / sewer project in Port Orange, Florida. Completed plans call for site work for a water / sewer project.

The project entails sanitary sewer and drainage infrastructure improvements within the east section of the Leisure Circle neighborhood. The scope includes: Sanitary Sewer Installation: Installation of three (3) doghouse-style manholes and one (1) traditional-style manhole. Installation of approximately 595 linear feet (LF) of new sewer mains. Installation of approximately 250 LF of sewer laterals. Grout filling of approximately 650 LF of existing sewer mains and three (3) existing manholes. Installation of necessary bypass piping to maintain service during construction. Stormwater Drainage Improvements: Replacement of approximately 30 LF of 12-inch reinforced concrete pipe (RCP). Replacement of 24-inch RCP and four (4) associated drainage inlets. Please refer to Leisure Circle Sewer Replacement Plans and Leisure Circle Sewer Replacement Bidder must include with their submittal a bid guarantee in the form of a bid bond executed by the Bidder and an acceptable surety or a certified check or bank draft payable to the City of Port Orange, Florida in an amount equal to five percent (5%) of the proposed bid. If awarded, the Bidder must also be able to obtain both payment and performance bonds equal to one hundred percent (100%) of the project value from a surety company licensed in Florida and must submit proof of their present bonding capacity with their submitted bid package in the form of a current (not older than 3 months) letter from Bidders bonding agent. Bidder's failure to include the bonding capacity letter with bid package may result in rejection of Bidder's submittal. The project entails sanitary sewer and drainage infrastructure improvements within the east section ofthe Leisure Circle neighborhood. All questions shall be directed in writing to Jill Poolman @jpoolman@port-orange.org and purchdiv@port-orange.org and reference Questions on ITB #25-18 Leisure Circle Sewer Replacement Project in the subject line. Last day for questions will be September 2, 2025, by 5:00 PM EST.

Award

Water / Sewer

$462,700.00

Public - City

Site Work

16

10

2

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
140
Bidding Soon
1,839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

November 17, 2025

Project location map

To Be Determined, Port Orange, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.