Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 11, 2026 at 8:00 PM
Updated July 27, 2026
Site work and new construction of a recreation facility in Port Orange, Florida. Completed plans call for the construction of a recreation facility; and for site work for a recreation facility.
Construct ion of a New Recreational Center for the Westside Community Center Pre-Construction and Construction Services for phase 1 of 2, construction of a new recreation building "REC West" in accordance with Florida Statute 287.055, known as the "Consultants' Competitive Negotiation Act" (the "CCNA"). The first phase of construction will include the following: o a two-court gymnasium o an indoor play area o meeting/rental rooms o public spaces o an e-sports room o an outdoor skate park o and offices for the Recreation Department's staff and potentially a splash pad. CMAR Services Scope: o Review and familiarize with 100% design documents o Develop construction phasing and sequencing plans o Prepare and maintain a detailed construction schedule o Provide cost estimating and value engineering as needed o Procure subcontractors and suppliers in accordance with applicable procurement laws o Manage construction activities including quality control, safety, and compliance o Coordinate with City staff, design team, and regulatory agencies o Provide commissioning and closeout services o Collaborate with the design team during design development o Provide constructability reviews and value engineering o Develop preliminary cost estimates and construction schedules o Assist in identifying long-lead items and procurement strategies o Provide Guaranteed Maximum Price (GMP) proposal based on design milestones o Manage construction activities upon completion of design, similar to Phase I General Requirements: o Demonstrated experience with CMAR delivery method for water/wastewater infrastructure o Proven ability to manage multi-phase projects with overlapping timelines o Familiarity with environmental permitting and regulatory compliance o Commitment to safety, quality, and schedule adherence o Ability to work collaboratively with City staff and design consultants Authorization for Services under the contract shall be in the form of written Purchase Order issued and executed by the City and signed by the awarded firm f awarded, the Respondent must be able to obtain a payment and performance bond equal to one hundred percent (100%) of project value from a surety company licensed in Florida and must submit proof of their present bonding capacity with their submitted bid package in the form of a current (not older than 3 months) letter from Bidder's bonding agent. Bidder's failure to include the bonding capacity letter with bid package may result in rejection of Bidder's submittal. All questions shall be directed in writing to Catrina Wilson, Purchasing Manager at cwilson@port-orange.org and purchdiv@port-orange.org and reference "Questions on RFSQ #26-07 REC Westside Community Center in the subject line. Last day for questions will be June 30, 2026, at 5:00 PM EST The City of Port Orange reserves the right to reject any or all Statements of Qualifications or parts of Statements of Qualifications if it is in the best interest of the City.
Post-Bid
Amusement and Recreation
$40,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
November 23, 2026
1000 City Center Cir, Port Orange, FL
Related To This Project
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
Bid Date: Nov 04 2025
Port Orange, FL
Bid Date: Jan 08 2026
Port Orange, FL
Bid Date: Nov 14 2025
Port Orange, FL
--
Port Orange, FL
Bid Date: Sep 30 2025
Port Orange, FL
Bid Date: Sep 15 2025
Port Orange, FL
Bid Date: Sep 16 2025
Port Orange, FL
Bid Date: Sep 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
