Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2026 at 7:00 PM
Updated January 9, 2026
Site work and new construction of a mixed-use development in Port Orange, Florida. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and municipal facility.
Tomoka Farms Landfill - Fleet Management Solid Waste Shop PEMB Construction of a new open-air pre-engineered metal building (PEMB) canopy structure (to include entire structure, electrical, and plumbing) adjacent to an existing vehicle maintenance facility at the Tomoka Farms Landfill in Port Orange, Florida. The project will provide covered workspace for fleet vehicle maintenance and repair operations. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline Date 12/11/2025 to 12/19/2025 as per Addendum 3
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$250,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2026
February 9, 2026
2415 Tomoka Landfill Rd, Port Orange, FL
Related To This Project
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
Bid Date: Apr 29 2021
Port Orange, FL
Bid Date: Dec 07 2020
Port Orange, FL
--
Port Orange, FL
Bid Date: Nov 04 2025
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
Bid Date: Nov 04 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
