Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 15, 2025 at 7:00 PM
Updated November 20, 2025
Site work for a fire / police facility in Port Orange, Florida. Completed plans call for site work for a fire / police facility.
Restoration of the existing shooting range berms located off Pioneer Trail. This project is to restore the front slope of the berm to ensure long-term stability, erosion control, and continued safe operation of the range. Bidders must be a commercial entity licensed to do business in the State of Florida and perform the services identified herein. Bidders shall be a certified General Contractor or a certified Underground Utility and Excavation Contractor properly registered and licensed to provide the services identified in the scope of work by all applicable state and local agencies. Question Deadline 10/31/2025 at 5:00 PM ET All questions shall be directed in writing to Buyer, Rita Cooper rcooper@port-orange.org and purchdiv@portorange.org and reference Questions on ITB #25-19 Police Department Shooting Range Berm Restoration in the subject line. Bidder must include with their submittal a bid guarantee in the form of a bid bond executed by the Bidder and an acceptable surety or a certified check or bank draft payable to the City of Port Orange, Florida in an amount equal to five percent (5%) of the proposed bid. If awarded, the Bidder must also be able to obtain both payment and performance bonds equal to one hundred percent (100%) of project value from a surety company licensed in Florida and must submit proof of their present bonding capacity with their submitted bid package in the form of a current (not older than 3 months) letter from Bidder's bonding agent. Bidder's failure to include the bonding capacity letter with bid package may result in rejection of Bidder's submittal. REGRADING OF FRONT SLOPE - Import, place and grade fill material necessary to achieve final grades as shown on Sheets C1 & C2 and quantified. -Reshape and stabilize the front face of the existing earthen berm to restore the intended slope profile and surface condition. -Grading work must ensure consistent slope, proper drainage, and adequate compaction INSTALLATION OF GEOWEB SYSTEM Furnish and install a geocell/geoweb soil stabilization system on the regraded front slope. The Geoweb System includes all work, equipment, and materials necessary for the installation ofthe GEOWEB GW30V6 Panels Filled with topsoil, 8-inch solid wall PVC Deadman, Atra Speed Stakes, TP-225 Tendons, Nonwoven geotextile separation layer, and the geotextile liner membrane. o Installation must be performed per manufacturer specifications, including proper anchoring and infill as shown on Sheets C1 & C2 and Attachment 4 RESODDING - Import and fill Geoweb Panels with 6-inches of topsoil. - Provide and install rolled Bermuda sod over the geoweb system and any disturbed areas. - Include soil preparation and any necessary watering to ensure vegetation takes hold.
Post-Bid
Fire / Police
$110,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2025
December 15, 2025
Pioneer Trail, Port Orange, FL
Related To This Project
Port Orange, FL
Bid Date: Nov 04 2025
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
Bid Date: Nov 04 2025
Port Orange, FL
Bid Date: Jan 08 2026
Port Orange, FL
Bid Date: Sep 30 2025
Port Orange, FL
--
Port Orange, FL
Bid Date: Sep 30 2025
Port Orange, FL
Bid Date: Sep 15 2025
Port Orange, FL
Bid Date: Sep 16 2025
Port Orange, FL
Bid Date: Sep 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
