BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Holyoke, Massachusetts. Working plans call for the renovation of a municipal facility.

Project is cancelled and no definite date for rebid. Inviting sealed bids from GC's and filed sub-Bidders for the Roof Renovations to City Hall Annex, DPW and Childrens Museum/Volleyball Hall of Fame. Approximately 27,000 sq. ft. in total. Contractor Qualification DCAMM Certificate The City reserves the right to reject any and all bids. Time for Completion. The Contractor shall commence the Work under this Contract on the date specified in the written Notice to Proceed, and shall bring the Work to Substantial Completion no later than 90 days thereafter and Final Completion within an additional 30 days A. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: The Work of Project is defined by the Contract Documents and consists of reroofing three buildings for the City ofHolyoke: 1. City Hall Annex building, which includes approx. 8,000 s.f. roof replacement, masonry chimney repair, partial stone and masonry repointing. Demolition of penthouse exterior stucco skin. Re-skin penthouse with metal wall panel system. Removal of exist pyramid style skylights and replaced with new gable style glass skylights in existing openings. Limited site work includes rain leader tie-in to existing storm drain and pavement patching and repair. 2. DPW building, which includes approx. 5,000 s.f. of partial roof to be replaced, new drains with new locations, demolition of masonry chimneys and new boiler flue. Removal of one skylight with new gable style placed in existing opening. 3. Children's Museum, which includes approx. 14,000 s.f. roof replacement and adding overflow scuppers. Demolishing exterior thin brick skin of clerestory. Re-skin clerestory with metal wall panel system. Completion- 114 consecutive calendar days. Locations- City Hall Annex -20 Korean Veterans Plaza #300, Holyoke, MA 01040; Public Works Department - 63 N Canal St Holyoke, MA 01040, USA ; Children's Museum - 444 Dwight St Holyoke, MA 01040, USA The work is estimated to cost $3,425,000.00.

Final Planning

Municipal

$3,425,000.00

Public - City

Renovation

40

27

4

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
196
Bidding Soon
3,188
All Active Projects
1,412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

January 1, 2025

img_map_placeholder

Multiple Locations, Holyoke, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.