BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Site work and environmental remediation for a civil project in Holyoke, Massachusetts. Completed plans call for site work for a bridge / tunnel; for environmental remediation for a bridge / tunnel; and water / sewer project.

The existing bridge on Whitney Ave that runs over I-91 North & South carries approximately 200' of an Intermediate Pressure (IP) 6" coated steel gas main encased in a 10" steel sleeve. During a recent inspection, it was noted that the pipeline sleeve is in need of remediation to protect against atmospheric corrosion. This gas line can only be safely accessed from underneath the bridge while stationed on I-91 which requires working with specialized equipment and is subject to MA DOT work zone permit restrictions (i.e. work hours, traffic control measures, etc.). Prevailing Wage Rates apply. OSHA training required. All bidders are required to submit a bid deposit equal to 5% of bid. The successful bidder will be required to obtain satisfactory Payment Bond equal to 50% of bid. Estimated date of completion shall be included with the bid package and extensions may be requested but are at HG&E's sole option and discretion. Any questions regarding this Invitation to Bid or any proposed Contract Documents shall be in writing to: Chi Wong Purchasing Coordinator Holyoke Gas & Electric 99 Suffolk Street, Holyoke, MA 01040 Fax 413.552.0392 Email cwong@hged.com Gas pipe on existing bridge on Whitney Ave that pipeline sleeve is in need of remediation to protect against atmospheric corrosion.

Bid Results

Bridges / Tunnels

$45,500.00

Public - City

Environmental Remediation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
612
Active Projects
232
Bidding Soon
4,471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

Project location map

Whitney Ave, Holyoke, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.