BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boon, Michigan. Working plans call for site work for a water / sewer project.

That Time for the Following Work: Sanitary Sewer Pipe Rehabilitation Work Shall Include, but Not Be Limited to, Mobilization, Cleaning and Televising the Selected Sanitary Sewers, Removal of Debris, by-pass Pumping, Traffic Control, Installation of the Cured-in-place Lining, Reconnection of All Services and Branch Connections, Restoration of the Work Area, Testing, Televising the Sewer Depicting the Final Product and All Other Related Work. Sanitary Sewer Manhole Rehabilitation Work Shall Include, but Not Be Limited to, Mobilization, Assessing and Cleaning the Manhole, Removal of Debris and Encrustation, Rebuilding the Bench and Channel, Rebuilding the Chimney, Installing Interior Chimney Band, Installation of the Cured-in-place Grout and Polymer Liner, Replacing the Frame and Cover, Installing Interior Drop Pipe, by-pass Pumping, Traffic Control, Restoration of the Work Area, Testing, and All Other Related Work. A Properly Completed Bid Bond, Certified Check or Cashier's Check in a Sum Not Less Than Five (5) Percent of the Proposed Amount of the Proposal Submitted, Shall Accompany Each Proposal as Security for Acceptance of the Contract by the Lowest Qualified Bidder. Should the Contractor Fail to Enter Into a Contract Agreement With the Owner, Through No Fault of the Owner, He Shall Forfeit the Entire Amount of the Security to the Owner. All Bids Shall Remain Firm and May Not Be Withdrawn for Ninety (90) Days After the Actual Date of Opening Thereof. The Contractor Selected to Perform This Project Must Have a Minimum of 5yrs of Experience Working With Ambient Cure Cipp Products and a Minimum of 1,000 Installations. The Successful Contractor Must Also Have a Minimum of 5yrs of Experience Installing Sectional Liners With a Minimum of 500 Installations in the State of Michigan. Documentation of the Minimum Requirements Including Owner, Project Name, Location and Date Shall Be Included With the Bid Package. Those Who Do Not Meet These Qualifications Shall Be Considered Nonresponsive and Their Bid Returned. Work Will Be Performed as Needed. All Inquiries and Questions Shall Be Directed to C.e. Raines Company at Telephone 734-285-7510, or by Email at Kmarx@charlesraines.com Per Addendum 1 this project is postponed indefinitely and per owner will re-bid at a future time and date TBD.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
10
Bidding Soon
192
All Active Projects
72
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Boon, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.