Site work and paving for a transportation facility in Ashland, Wisconsin. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Description of work: Base Bid: Runway 2/20 Rehabilitation Alternate Bid #1: Runway 2/20 Lighting Replacement Alternate Bid #2: Airport Owned NAVAIDS Improvements Alternate Bid #3: Taxiway Relocation Alternate Bid #4: Taxiway Lighting Installation Base Bid: Excavation Common 2,950 CY; Borrow 9,400 CY; Base Aggregate Dense 1 1/4 " 2,600 Tons; Pulverize and Relay 62,250 SY; HMA Pavement 3MT 58-34 S 8,250 Tons; HMA Pavement 4MT 58-34 H 6,350 Ton; Salvaged Topsoil 66,250 SY; Mulching, Method B (Wood Fiber) 66,250 SY; Painting, White, Waterborne, Type I 19,100 SF. Alternate Bid #1: No.8 AWG, 5KV, L-824, Type C Cable 12,600 LF; Non-Encased, HDPE Electrical Conduit, 1-Way 1-1/4-Inch 11,850 LF; Medium Intensity Runway Lights, L-861(L) Base Mounted 50 EA; LED L-858(L) Guidance Sign, 2-Module 4 EA; New Regulator for Runway 2/20 Circuit - 7.5 KW 1 EA Alternate Bid #2: REILS Constant Current L-849I(L), Style A 2 EA; Runway 20 PAPI L-880(L), Style B, Class II 1 EA. Alternate Bid #3: Excavation Common 4,250 CY; Borrow 1,900 CY; Base Aggregate Dense 1 1/4 " 1,100 CY; Select Crushed Material 2,050 CY; HMA Pavement 3MT 58-34S 600 Ton; HMA Pavement 4MT 58-34 H 475 Ton; Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 14x32-Inch 272 LF; Mulching Method B (Wood Fiber) 12,600 SY; Geotextile Type SAS 9,600 SY; PVC Pipe Underdrain 6-Inch, Complete Including Porous Backfill No.2 and Separation Geotextile, Class 2 1,900 LF. Alternate Bid #4: No.8 AWG, 5KV, L-824, Type C Cable 2,650 LF; Non-Encased, HDPE Electrical Conduit, 1-Way 1-1/4 Inch 2,300 LF; Medium Intensity Taxiway Lights, L-861T(L), Base Mounted 31 EA. DBE Goal: 1.3% Contract Completion Time: 58 Working Days Proposal guaranty: A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, banks draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. Any prospective bidder who has not previously established their qualifications must file a pre-qualification statement on the proper forms and be received by the department no later than 12:00 noon, local time, Friday, April 26th , 2024. Only prime or general contractors submitting the bid need to be prequalified; subcontractors do not need to be prequalified.

Bid Results

Transportation Terminals

$3,797,744.00

Public - State/Provincial

Paving, Site Work

94

5

11

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
13
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

Project location map

Sanborn Ave, Ashland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.