Site work for a water / sewer project in Dublin, California. Completed plans call for site work for a water / sewer project.

Dublin San Ramon Services District (District or DSRSD) is seeking proposals from qualified firms for repair and rehabilitation of an 8-inch Vitrified Clay Pipe (VCP) sewer line near Del Mar Drive in San Ramon, CA. DSRSD has performed CCTV of the sewer line and identified the need to rehabilitate an 8-inch sewer line to address the voids and longitudinal cracks. The District would like the work to occur in the summer of 2024. Proposer shall schedule work so that all bypasses are performed during dry weather periods (April 15--October 15, 2024). The Proposer shall complete the field scope of work provided in the RFP no later than September 30, 2024. All project closeout items shall be completed by October 15, 2024. Anticipated Notice to Proceed mid-June 2024 Question Deadline 05/17/2024 Any questions during the proposal preparation should be directed via email to mann@dsrsd.com. They will have the overall responsibility for the contract and the day-to-day coordination of work. Any questions during the proposal preparation should be directed via email to mann@dsrsd.com. The Proposer shall possess, as a minimum, a valid Class A License. The Proposer or Proposer's subcontractor performing the bypass pump work on this project shall possess, as a minimum, a valid "A" and/or "C-34" (Pipeline) contractor's license. GOALS AND OBJECTIVES The District's objectives, including but are not limited to the following: 1. Rehabilitate an 8-inch Vitrified Clay Pipe (VCP) sewer line near Del Mar Drive in San Ramon, CA that is critical to conveying wastewater from surrounding area to the District's Wastewater Treatment Plant for treatment. 2. The Proposer is responsible for reviewing and analyzing the CCTV provided as part of the RFP and determining a detailed Rehab Action Plan for the repair and rehab of sewer line. This will include details on how to address the voids ahead of lining (voids at 37', 77', and 100'). Voids at 37' and 77' are within the steel encased portion of the pipe. Void at 100' is outside of the steel encased pipe. Two reasons that voids need to be addressed first are: a. to stabilize the soil around the void at 100'; and b. to insure a proper lining without a tear in the liner. 3. The Proposer is responsible for making a full structural repair of the pipeline whether using a sectional liner for spot repair after addressing the voids or a complete CIPP lining of the line after addressing the voids. All CIPP work shall comply with Section 15221: Cured-In-Place Rehabilitation of Existing Sewer provided in Attachment C. For spot repairs, the Proposer shall pay close attention to Section 3.05 Installation of Sectional Liner in Section 15221: Cured-In-Place Rehabilitation of Existing Sewer in Attachment C. 4. The Proposer shall provide a temporary bypass plan while the line is in the rehabilitation process. Proposer or Proposer's subcontractors shall notify residents within 500 feet of the project site. 5. The Proposer shall complete the field scope of work provided in the RFP no later than September 30, 2024. All project closeout items shall be completed by October 15, 2024.

Award

Water / Sewer

$172,000.00

Public - City

Site Work

12

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
189
Bidding Soon
3,539
All Active Projects
1,440
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2024

June 15, 2024

October 15, 2024

img_map_placeholder

7051 Dublin Blvd, Dublin, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.