BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Westford, Massachusetts. Completed plans call for the renovation of a educational facility.

Renovations to the First Floor Zone 5 Sprinklers at the Nashoba Valley Technical High School, Westford, MA. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. General Bid Deadline 5/22/24 Time 11:00 A.M. Those goals are MBE/WBE Combined goal of 10.4% of construction contract amount. The scope of Work includes, but not limited to; replacement of existing fire protection systems, remove and reinstall existing ceiling tiles affected by fire protection Work, and replacement of existing ceiling tiles damaged by Fire Protection Work with new acoustic ceiling panels. The estimated construction cost is $ 400,000.00. Question Deadline 05/15/2024 Questions regarding plan distribution should be directed to Andrew T. Johnson, Co., at (617) 742-1610. Questions regarding project bid documents shall be emailed to Mr. William Peters, Mount Vernon Group Architects, Inc. at bpeters@mvgarchitects.com. All questions and responses shall be distributed as an addendum to all on record as having received the bid documents. All questions as to the interpretation of the Contract Documents shall be submitted in writing to the Architect and answers to such questions will be sent by the Architect, only in the form of an Addendum, to every individual or firm on record as having taken a set of Contract Documents. No questions will be answered unless received at least seven days, Saturdays, Sundays, and legal holidays excluded prior to the expiration of the time set for filing of Sub-Bids or General Bids.

Post-Bid

Educational

$400,000.00

Public - City

Renovation

11

13

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
165
Bidding Soon
2,986
All Active Projects
1,226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

June 24, 2024

img_map_placeholder

100 Littleton Rd, Westford, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.