Site work for a water / sewer project in Throop, Pennsylvania. Completed plans call for site work for a water / sewer project.
**As of July 17, 2024 this project has not yet been awarded and still pending for approval. Construct the Secondary Clarifer Improvements at the Lackawanna River Basin Sewer Authority's (LRBSA's) existing Clinton Wastewater Treatment Plant (WWTP) as needed to produce a fully functioning plant as fully described in the Conformed Project Manual. Construction must be phased with the demolition of the existing clarifiers and activated sludge return and wasting system and the construction of the second new clarifier beginning after the first clarifier and return activated sludge building are complete and operational. Contract 24-3.1 General Construction General Contractor shall perform general construction of the new treatment facilities including but not limited to two circular secondary clarifiers; a Return Activated Sludge (RAS) Building housing Return/Waste Activated Sludge pumps, plus magnesium hydroxide and polymer feed systems; reactor and clarifier influent flow distribution structures; utility water pumps and distribution pipe network; aeration tank air supply piping. Extend asphalt plant drive to RAS Building. Provide all necessary construction that is not specified under the Electrical and Heating and Ventilation Contracts. Provide all associated process piping, fittings, and valves both buried as well as inside buildings and tanks; miscellaneous asphalt paving, concrete sidewalk and steps, fencing modifications, site grading, erosion, and sediment control; site restoration; painting; and other accessories and facilities. Demolish existing secondary clarifiers, return, and waste sludge piping and controls, aeration tank and clarifier influent flow distribution, utility water pumping facilities plus associated process piping, fittings, and valves both buried plus inside buildings and tanks, along with miscellaneous asphalt paving, sidewalk and steps, fencing, etc. Contract 24-3.2 Electrical Construction Contract Electrical Contractor shall perform electrical construction of the new treatment facilities including but not limited to providing electrical power supply and control wiring to the RAS Building and the following new treatment facilities: two secondary clarifiers; Return/Waste Activated Sludge pumps; magnesium hydroxide and polymer feed systems; utility water pumps. Provide new main control panel located in new RAS Building, including PLC and required process control programming and integrate control panels provided by RAS/WAS, chemical feeds, and utility water pumps manufacturers with existing process controls. Provide variable frequency drives for RAS/WAS pumps. Provide process control metering and instrumentation. Provide power distribution and building interior lighting in the RAS Building and limited site lighting. Distribute power to electric heaters, ventilation fans and ductless split system serving the RAS Pump Station. Provide all other electrical accessories and facilities including wiring, conduit and hangars, safety and disconnect switches, etc. Deenergize electrical power distribution and controls to the existing secondary clarifiers, RAS/WAS system, and utility water pumping facilities in order to allow General Contractor to demolish. Contract 24-3.1 Heating and Ventilation Construction Contract Heating and Ventilation Contractor shall perform heating and ventilation construction of the new RAS Building including electric heaters, ventilation fans and ductless split system and all necessary accessories and facilities to provide a fully functioning building. All bidders for each contract will be required to furnish fully executed original Proposal (or Bid) forms. Bidders must provide with their Proposal (or Bid) either a certified bank treasurer's check, a certified cashier's check payable to the order of LRBSA or a bid bond in the amount of ten percent (10%) of the bid. Bidders must also provide with their Proposal a fully completed Non-Collusion Affidavit and a Public Works Employment Verification Form. Bidders will be required to submit with their bids proof of prior relevant experience and adequate resources to complete the project. Failure to fully comply with all bid requirements including but not limited to the above will be cause to reject a bid. uestion Deadline 06/06/2024 Bidders must request clarifications and/or interpretations of Bidding Documents from the Engineer in writing. Bid Result : General Construction - The Milnes Co., Inc. - $ 5,520,596.00 HVAC Construction - Scranton Electric Heating & Cooling Service, Inc. - $ 31,976.00
Bid Results
Water / Sewer
$5,552,572.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2024
August 2, 2024
101 Boulevard Ave, Throop, PA
Related To This Project
Throop, PA
Bid Date: May 23 2024
Throop, PA
Bid Date: Nov 11 2024
Throop, PA
Bid Date: Nov 11 2024
Throop, PA
Bid Date: Apr 11 2024
Throop, PA
Bid Date: Jan 25 2024
Throop, PA
Bid Date: Jan 25 2024
Throop, PA
--
Throop, PA
Bid Date: Jul 26 2019
Throop, PA
Bid Date: May 10 2019
Throop, PA
Bid Date: Feb 22 2019
Throop, PA
Bid Date: Feb 08 2019
Throop, PA
Bid Date: Jul 30 2018
Throop, PA
Bid Date: Feb 25 2019
Throop, PA
Bid Date: May 13 2019
Throop, PA
Bid Date: Apr 05 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.