Published July 31, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Throop, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of July 17, 2024 this project has not yet been awarded and still pending for approval. Construct the Secondary Clarifer Improvements at the Lackawanna River Basin Sewer Authority's (LRBSA's) existing Clinton Wastewater Treatment Plant (WWTP) as needed to produce a fully functioning plant as fully described in the Conformed Project Manual. Construction must be phased with the demolition of the existing clarifiers and activated sludge return and wasting system and the construction of the second new clarifier beginning after the first clarifier and return activated sludge building are complete and operational. Contract 24-3.1 General Construction General Contractor shall perform general construction of the new treatment facilities including but not limited to two circular secondary clarifiers; a Return Activated Sludge (RAS) Building housing Return/Waste Activated Sludge pumps, plus magnesium hydroxide and polymer feed systems; reactor and clarifier influent flow distribution structures; utility water pumps and distribution pipe network; aeration tank air supply piping. Extend asphalt plant drive to RAS Building. Provide all necessary construction that is not specified under the Electrical and Heating and Ventilation Contracts. Provide all associated process piping, fittings, and valves both buried as well as inside buildings and tanks; miscellaneous asphalt paving, concrete sidewalk and steps, fencing modifications, site grading, erosion, and sediment control; site restoration; painting; and other accessories and facilities. Demolish existing secondary clarifiers, return, and waste sludge piping and controls, aeration tank and clarifier influent flow distribution, utility water pumping facilities plus associated process piping, fittings, and valves both buried plus inside buildings and tanks, along with miscellaneous asphalt paving, sidewalk and steps, fencing, etc. Contract 24-3.2 Electrical Construction Contract Electrical Contractor shall perform electrical construction of the new treatment facilities including but not limited to providing electrical power supply and control wiring to the RAS Building and the following new treatment facilities: two secondary clarifiers; Return/Waste Activated Sludge pumps; magnesium hydroxide and polymer feed systems; utility water pumps. Provide new main control panel located in new RAS Building, including PLC and required process control programming and integrate control panels provided by RAS/WAS, chemical feeds, and utility water pumps manufacturers with existing process controls. Provide variable frequency drives for RAS/WAS pumps. Provide process control metering and instrumentation. Provide power distribution and building interior lighting in the RAS Building and limited site lighting. Distribute power to electric heaters, ventilation fans and ductless split system serving the RAS Pump Station. Provide all other electrical accessories and facilities including wiring, conduit and hangars, safety and disconnect switches, etc. Deenergize electrical power distribution and controls to the existing secondary clarifiers, RAS/WAS system, and utility water pumping facilities in order to allow General Contractor to demolish. Contract 24-3.1 Heating and Ventilation Construction Contract Heating and Ventilation Contractor shall perform heating and ventilation construction of the new RAS Building including electric heaters, ventilation fans and ductless split system and all necessary accessories and facilities to provide a fully functioning building. All bidders for each contract will be required to furnish fully executed original Proposal (or Bid) forms. Bidders must provide with their Proposal (or Bid) either a certified bank treasurer's check, a certified cashier's check payable to the order of LRBSA or a bid bond in the amount of ten percent (10%) of the bid. Bidders must also provide with their Proposal a fully completed Non-Collusion Affidavit and a Public Works Employment Verification Form. Bidders will be required to submit with their bids proof of prior relevant experience and adequate resources to complete the project. Failure to fully comply with all bid requirements including but not limited to the above will be cause to reject a bid. uestion Deadline 06/06/2024 Bidders must request clarifications and/or interpretations of Bidding Documents from the Engineer in writing. Bid Result : General Construction - The Milnes Co., Inc. - $ 5,520,596.00 HVAC Construction - Scranton Electric Heating & Cooling Service, Inc. - $ 31,976.00

Bid Results

Water / Sewer

$5,552,572.00

Public - City

Site Work

118

33

33

8

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Plastic Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Vibration and Seismic Controls for Fire-Suppression Piping and Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Vibration and Seismic Controls for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
122
Bidding Soon
1,560
All Active Projects
715
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

August 2, 2024

img_map_placeholder

101 Boulevard Ave, Throop, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Clinton WWTP Secondary Clarifier Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.