BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Windsor, Colorado. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000351496 Job Location: 7th St & Walnut St intersection in Windsor Road Name: 7th St Length: +/-700 ft The work of this contract consists of hardening 2021 paint and post interim improvements by installing raised medians, concrete curb ramps, curb and gutter, signing, RRFB pedestrian crossing improvements, bike lane striping, mill and overlay on 7th Street between Main St (CO392) and Walnut St as shown in the construction drawings; the overlays will cover approximately 3,350 SY of roadway. See the construction drawings for additional information. A. The work of this contract consists of hardening 2021 "paint and post" interim improvements by installing raised medians, concrete curb ramps, curb and gutter, signing, RRFB pedestrian crossing improvements, bike lane striping, mill and overlay on 7th Street between Main St (CO392) and Walnut St as shown in the construction drawings; the overlays will cover approximately 3,350 SY of roadway. See the construction drawings for additional information. B. Furnish all materials, equipment, supplies, and appurtenances; provide all construction plant equipment and tools; and perform all necessary labor and supervision. C. Coordinate the progress of the Work, including coordination between trades, subcontractors, suppliers, public utilities, and the Owner to ensure the progress of the Work. D. It is the intent of this contract that Work proceed in the most expeditious manner possible. E. Construct the Work under a unit price contract as indicated in the Bid Form Question Deadline 05/16/2024 at 5:00 PM MT Questions are submitted online Yes, Any questions regarding the project are due date and time. No questions received after this date will be answered unless an addendum extends the bid date. The Project is to be Substantially Complete by August 13, 2024. The Project is to be completed and ready for final payment in accordance with paragraph 15.06 of the Standard General Conditions of the Construction Contract (Section C-700) by or before August 27, 2024. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % No Bid may be withdrawn for the period of time after the date Bids are opened, which is specified in the Bid Form. Owner reserves the right to reject any or all Bids, to waive any informalities or irregularities therein, and to reject nonconforming, non-responsive, or conditional bids. The decision of the Owner shall be final.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

16

12

2

5

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
106
Bidding Soon
1,525
All Active Projects
624
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2024

June 24, 2024

August 27, 2024

img_map_placeholder

7th St, Windsor, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.