BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a educational facility.

Mitchell Corridor Casework Question Deadline 05/27/2024 at 12:00 PM CT Questions Due to: kzastrow@selzer-ornst.com School is requesting additional storage and coat cabinets at select locations within the school, located in main corridors on (2) floors of the building. Scope delineation for each type of casework requested include: Classroom Supplies Storage - (6) total locations Plastic Laminate Casework o Cabinet Size - 4ft H x 4ft W x 2ft D o Adjustable Shelving - Assume (3) with each assembly o Door pull hardware - Typical per specifications o All doors to lock - Typical per specifications o Color TBD - Assume a standard color selection Plastic Laminate Countertop o Span full width of casework o 4" backsplash o Color TBD - Assume a standard color selection Demolition o Removal of existing wood base at each cabinet location Installation of casework assemblies o Utilize existing studs for mounting o Assume toggle bolting, as needed, depending on stud layout Vinyl Base around cabinet units o Return back to existing wall - Clean finish where meets existing wood base Classroom Coat Storage - (3) total locations Plastic Laminate Casework o Cabinet Size - 7ft H x 4ft W x 2ft D Will be used for coat storage Provide (2) coat poles within cabinet NOTE: Exact sizes to be verified onsite w/ existing conditions o Door pull hardware - Typical per specifications o All doors to lock - Typical per specifications o Color TBD - Assume a standard color selection Demolition o Removal of existing wood base at each cabinet location Wall Furring Wall recesses at roughly 4ft AFF - Fur out for flush surface o Assume minor drywall and finishes work at furring o Will require painting at furring to match adjacent wall color Installation of casework assemblies o Utilize existing studs for mounting o Assume toggle bolting, as needed, depending on stud layout Vinyl Base around cabinet units o Return back to existing wall - Clean finish where meets existing wood base

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
71
Bidding Soon
1,195
All Active Projects
476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

June 28, 2024

img_map_placeholder

1728 S 23rd St, Milwaukee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.