BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2024 at 8:00 PM

Updated August 16, 2024

Site work and paving for a mixed-use development in Swanton, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and water / sewer project.

**As of August 15, 2024, This project has been awarded to Ebony Construction Company, Inc., with the awarded amount of $860,361.15.** The Project includes the following Work: Resurfacing of Hallett Ave from Airport Hwy to north of Garfield Ave, with pavement repairs as needed. Includes replacement of curb/gutter and new ADA compliant sidewalk, curb ramps, drainage improvements, and crosswalks along the west side of the roadway with widening of the existing bridge over Ai Creek for pedestrian access Bids are requested for the following Contract: FUL-CR1-5.12 - Hallett Avenue Improvements, Phase A Only ODOT pre-qualified contractors are eligible to submit bids for this project. Pre-Qualification status must be in force at the time of the bid, at the time of award, and through the life of the construction contract. Bidders are also expected to provide an experience statement indicating their ability to perform the work as required in the contract documents. The DBE goal for this project is 7.0%. All Bidders who are not a certified DBE firm must submit an online DBE Utilization Plan to ODOT for a bid to be responsive A certified check, cashier's check or letter of credit in favor of the Village of Swanton, Ohio, in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. The Village of Swanton, Ohio, reserves the right pursuant to ORC.9.312 to reject any and all bids and to waive any non-material irregularity in determining the lowest responsive and responsible bidder. No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids. The successful bidder will be required to pay federally determined Davis-Bacon Wage Rates. Owner anticipates that the Project's total bid price will be approximately $740,900.00. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Dennis Fitzgerald, P.E., Kleinfelder, Inc., 1168 North Main Street, Bowling Green, Ohio 43402, 567-331-2726, dfitzgerald@kleinfelder.com. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Roads / Highways

$860,361.00

Public - City

Paving, Site Work

59

11

4

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
202
Bidding Soon
2,452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

September 1, 2024

Project location map

Hallett Ave, Swanton, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.